Skip to Main Content
Article navigation

Brickwork & masonry

Innovative retrofitted reinforcement techniques for masonry arch bridges. Sumon S. K. Sep. 99–99

Bridges

A risk-based decision-support strategy for bridge management. Flaig K. D. and Lark R. J. Sep., 101–106

A simplified integral composite bridge connection. Riches O. J., Carstairs N. A. and Jones A. E. K. Jun., 63–69

A1 River Tyne bridge, UK—design and construction. Metheringham S. and Townshend J. Jun., 45–52

A34 Chievely/M4 junction 13 improvement: design. Place D., Farooq I. and Carter S. Mar., 15–23

Design and construction of the Sail Bridge, Swansea, UK. Sanders P. A. and Firth I. P. T. Dec., 143–153

Efficient dynamic performance assessment of a footbridge. Brownjohn J. M. W. and Middleton C. Dec., 185–192

Filsa Bridge, Norway—a record-breaking timber bridge. Ekeberg P. K. and Søyland K. Mar., 17

Footbridge over the Sant Adria Marina, Barcelona, Spain. Aparicio Á. C. and Ramos G. Dec., 193–200

Human–structure dynamic interaction in footbridges. Živanović S., Pavic A. and Reynolds P. Dec., 165–177

Models for evaluating the costs of bridge failure. Wong S. M., Onof C. J. and Hobbs R. E. Sep., 117–128

Open sandwich bridge deck construction—20 years on. Mays G. C. and Dakers J. J. Jun., 81–89

Performance of a stress-laminated-timber arch bridge. Kermani A. and Freedman G. Dec., 155–164

Probabilistic pedestrian lateral excitation of bridges. Roberts T. M. Jun., 53–61

Refurbishment of the old Medway bridge, UK. Smith D. A. Sep., 129–139

Repair and stabilisation of Trinity Bridge, Crowland, UK. Waters R. A. Mar., 9–13

Resonant vibration of shallow suspension footbridges. Huang M.-H., Thambiratnam D. and Perera N. J. Dec., 201–209

The replacement of Carbrain Gully footbridge. Greenslade D. Dec., 179–184

Upgrading of Central Motorway junction, Auckland. Corbett P. W. and Edmonds M. A. Mar., 25–36

Cables & tendons

Design and construction of the Sail Bridge, Swansea, UK. Sanders P. A. and Firth I. P. T. Dec., 143–153

Composite structures

A simplified integral composite bridge connection. Riches O. J., Carstairs N. A. and Jones A. E. K. Jun., 63–69

Open sandwich bridge deck construction—20 years on. Mays G. C. and Dakers J. J. Jun., 81–89

Concrete structures

A1 River Tyne bridge, UK—design and construction. Metheringham S. and Townshend J. Jun., 45–52

Refurbishment of the old Medway bridge, UK. Smith D. A. Sep., 129–139

Thermal-creep analysis of concrete bridges. Xu Q. and Burgoyne C. Sep., 107–115

Conservation

Repair and stabilisation of Trinity Bridge, Crowland, UK. Waters R. A. Mar., 9–13

Design methods & aids

A simplified integral composite bridge connection. Riches O. J., Carstairs N. A. and Jones A. E. K. Jun., 63–69

A34 Chievely/M4 junction 13 improvement: design. Place D., Farooq I. and Carter S. Mar., 15–23

Dynamics

Design and construction of the Sail Bridge, Swansea, UK. Sanders P. A. and Firth I. P. T. Dec., 143–153

Efficient dynamic performance assessment of a footbridge. Brownjohn J. M. W. and Middleton C. Dec., 185–192

Human–structure dynamic interaction in footbridges. Živanović S., Pavic A. and Reynolds P. Dec., 165–177

Performance of a stress-laminated-timber arch bridge. Kermani A. and Freedman G. Dec., 155–164

Probabilistic pedestrian lateral excitation of bridges. Roberts T. M. Jun., 53–61

Resonant vibration of shallow suspension footbridges. Huang M.-H., Thambiratnam D. and Perera N. J. Dec., 201–209

Failures

Models for evaluating the costs of bridge failure. Wong S. M., Onof C. J. and Hobbs R. E. Sep., 117–128

Field testing & modelling

Efficient dynamic performance assessment of a footbridge. Brownjohn J. M. W. and Middleton C. Dec., 185–192

Foundations

Repair and stabilisation of Trinity Bridge, Crowland, UK. Waters R. A. Mar., 9–13

Maintenance & inspection

A risk-based decision-support strategy for bridge management. Flaig K. D. and Lark R. J. Sep., 101–106

Innovative retrofitted reinforcement techniques for masonry arch bridges. Sumon S. K. Sep., 91–99

Management

A risk-based decision-support strategy for bridge management. Flaig K. D. and Lark R. J. Sep., 101–106

Mathematical modelling

Human–structure dynamic interaction in footbridges. Živanović S., Pavic A. and Reynolds P. Dec., 165–177

Probabilistic pedestrian lateral excitation of bridges. Roberts T. M. Jun., 53–61

Piles & piling

A34 Chievely/M4 junction 13 improvement: design. Place D., Farooq I. and Carter S. Mar., 15–23

Rehabilitation, reclamation & renovation

Refurbishment of the old Medway bridge, UK. Smith D. A. Sep., 129–139

Research & development

Filsa Bridge, Norway—a record-breaking timber bridge. Ekeberg P. K. and Søyland K. Mar., 1–7

Risk & probability analysis

Models for evaluating the costs of bridge failure. Wong S. M., Onof C. J. and Hobbs R. E. Sep., 117–128

Roads & highways

Upgrading of Central Motorway junction, Auckland. Corbett P. W. and Edmonds M. A. Mar., 25–36

Steel structures

Footbridge over the Sant Adria Marina, Barcelona, Spain. Aparicio Á. C. and Ramos G. Dec., 193–200

Strength & testing of materials

Innovative retrofitted reinforcement techniques for masonry arch bridges. Sumon S. K. Sep., 91–99

Open sandwich bridge deck construction—20 years on. Mays G. C. and Dakers J. J. Jun., 81–89

Stress analysis

Thermal-creep analysis of concrete bridges. Xu Q. and Burgoyne C. Sep., 107–115

Temporary works

A1 River Tyne bridge, UK—design and construction. Metheringham S. and Townshend J. Jun., 45–52

Tendering

Upgrading of Central Motorway junction, Auckland. Corbett P. W. and Edmonds M. A. Mar., 25–36

Thermal effects

Thermal-creep analysis of concrete bridges. Xu Q. and Burgoyne C. Sep., 107–115

Timber structures

Filsa Bridge, Norway—a record-breaking timber bridge. Ekeberg P. K. and Søyland K. Mar., 1–7

Performance of a stress-laminated-timber arch bridge. Kermani A. and Freedman G. Dec., 155–164

The replacement of Carbrain Gully footbridge. Greenslade D. Dec., 179–184

Urban regeneration

The replacement of Carbrain Gully footbridge. Greenslade D. Dec., 179–184

or Create an Account

Close Modal
Close Modal