Article navigation

Brickwork & masonry

Load-carrying capacity of flooded masonry arch bridges. Hulet K. M., Smith C. C. and Gilbert M. Dec., 97–103

Bridges

A Bayesian belief network model of bridge deterioration. Attoh-Okine N. O. and Bowers S. Jun., 69–76

A fuzzy optimum model to assess bridge design options. Wang H.-L., Zhang Z., Huang C.-L. and Shi L. Mar., 9–15

Analytical fatigue assessment of riveted rail bridges. Imam B., Righiniotis T. D., Chryssanthopoulos M. K. and Bell B. Sep., 105–116

An environmental comparison of bridge forms. Collings D. Dec., 168

Calculating an influence line from direct measurements. Obrien E. J., Quilligan M. J. and Karoumi R. Mar., 31–34

Design and construction of two launched bridges. Beavor N. and Cai J. Sep., 137–145

Development of in situ joints for pre-cast bridge deck units. Gordon S. R. and May I. M. Mar., 17–30

Developments in the use of GPS for bridge monitoring. Brown C. J., Roberts G. W. and Meng X. Sep., 117–119

Eight footbridges in the Rembrandt Park in Amsterdam. Smits J. Jun., 63–67

Engineering, architecture and the River Po footbridge, Turin. Mairs D. and Whitby M. Jun., 47–52

Eurocodes implementation for highway bridges in the UK. Chakrabarti S. and Garden S. Dec., 149–151

Heat-straightening repairs to a steel road bridge. Clubley S. K., Winter N. and Turner K. W. Mar., 35–42

Innovations in concrete arch bridge design. Radic J., Šavor Z. and Kindij A. Sep., 121–126

Load-carrying capacity of flooded masonry arch bridges. Hulet K. M., Smith C. C. and Gilbert M. Sep., 97–103

Long-term maintenance strategies for highway bridges. Vassie P. R. and Arya C. Jun., 83–90

Recent concrete, self-anchored suspension bridges in China. Zhang Z., Teng Q.-J. and Qiu W.-L. Dec., 169–177

Reducing damage to concrete stitches in bridge decks. Kwan A. K. H. and Ng P. L. Jun., 53–62

Restoration of Bersted Crossing footbridge, Bognor Regis, UK. Macfarlane A. Sep., 93–95

St Paul's Footbridge, Ebbw Vale, Wales—landmark structure. Williams D. E. Jun., 77–81

Structural repair of elevated Harrow Road (westbound), UK. Yeoell D., Parasram T. and Hodgkinson B. Sep., 127–135

The replacement of Heath Town footbridge. Mordey A. G. Mar., 3–7

Cathodic protection

Structural repair of elevated Harrow Road (westbound), UK. Yeoell D., Parasram T. and Hodgkinson B. Dec., 127 –135

Codes of practice & standards

Eurocodes implementation for highway bridges in the UK. Chakrabarti S. and Garden S. Dec., 149–151

Composite structures

Design and construction of two launched bridges. Beavor N. and Cai J. Dec., 137–145

Development of in situ joints for pre-cast bridge deck units. Gordon S. R. and May I. M. Mar., 17–30

Concrete structures

Long-term maintenance strategies for highway bridges. Vassie P. R. and Arya C. Jun., 83–90

Recent concrete, self-anchored suspension bridges in China. Zhang Z., Teng Q.-J. and Qiu W.-L. Dec., 169–177

Reducing damage to concrete stitches in bridge decks. Kwan A. K. H. and Ng P. L. Jun., 53–62

Structural repair of elevated Harrow Road (westbound), UK. Yeoell D., Parasram T. and Hodgkinson B. Dec., 127–135

Conservation

Restoration of Bersted Crossing footbridge, Bognor Regis, UK. Macfarlane A. Dec., 93–95

Design methods & aids

A fuzzy optimum model to assess bridge design options. Wang H.-L., Zhang Z., Huang C.-L. and Shi L. Mar., 9–15

Direct heating

The replacement of Heath Town footbridge. Mordey A. G. Mar., 3–7

Education & training

Eurocodes implementation for highway bridges in the UK. Chakrabarti S. and Garden S. Dec., 149–151

Environment

An environmental comparison of bridge forms. Collings D. Dec., 168

Fatigue

Analytical fatigue assessment of riveted rail bridges. Imam B., Righiniotis T. D., Chryssanthopoulos M. K. and Bell B. Dec., 105–116

Field testing & monitoring

Calculating an influence line from direct measurements. Obrien E. J., Quilligan M. J. and Karoumi R. Mar., 31–34

Developments in the use of GPS for bridge monitoring. Brown C. J., Roberts G. W. and Meng X. Dec., 117–119

Floods & floodworks

Load-carrying capacity of flooded masonry arch bridges. Hulet, K. M., Smith C. C. and Gilbert M. Dec., 97–103

Land surveying

Developments in the use of GPS for bridge monitoring. Brown C. J., Roberts G. W. and Meng X. Dec., 117–119

GPS measurements on the London Millennium Bridge. Roberts G. W., Meng X., Brown C. J. and Dallard P. Dec., 153–161

Management

A Bayesian belief network model of bridge deterioration. Attoh-Okine N. O. and Bowers S. Jun., 69–76

St Paul's Footbridge, Ebbw Vale, Wales—landmark structure. Williams D. E. Jun., 77–81

Maintenance & inspection

Long-term maintenance strategies for highway bridges. Vassie P. R. and Arya C. Jun., 83–90

Mathematical modelling

A fuzzy optimum model to assess bridge design options. Wang H.-L., Zhang Z., Huang C.-L. and Shi L. Mar., 9–15

Railway systems

Restoration of Bersted Crossing footbridge, Bognor Regis, UK. Macfarlane A. Dec., 93–95

Research & development

Development of in situ joints for pre-cast bridge deck units. Gordon S. R. and May I. M. Mar., 17–30

GPS measurements on the London Millennium Bridge. Roberts G. W., Meng X., Brown C. J. and Dallard P. Dec., 153–161

Innovations in concrete arch bridge design. Radic J., Šavor Z. and Kindij A. Dec., 121–126

Risk & probability analysis

A Bayesian belief network model of bridge deterioration. Attoh-Okine N. O. and Bowers S. Jun., 69–76

Roads & highways

Recent concrete, self-anchored suspension bridges in China. Zhang Z., Teng Q.-J. and Qiu W.-L. Dec., 169–177

Steel structures

Design and construction of two launched bridges. Beavor N. and Cai J. Dec., 137–145

Eight footbridges in the Rembrandt Park in Amsterdam. Smits J. Jun., 63–67

Engineering, architecture and the River Po footbridge, Turin. Mairs D. and Whitby M. Jun., 47–52

St Paul's Footbridge, Ebbw Vale, Wales—landmark structure. Williams D. E. Jun., 77–81

The replacement of Heath Town footbridge. Mordey A. G. Mar., 3–7

Stress analysis

Heat-straightening repairs to a steel road bridge. Clubley S. K., Winter N. and Turner K. W. Mar., 35–42

Temporary works

Reducing damage to concrete stitches in bridge decks. Kwan A. K. H. and Ng P. L. Jun., 53–62

Thermal effects

Heat-straightening repairs to a steel road bridge. Clubley S. K., Winter N. and Turner K. W. Mar., 35–42

Urban regeneration

Engineering, architecture and the River Po footbridge, Turin. Mairs D. and Whitby M. Jun., 47–52

or Create an Account

Close subscription notice
Close access options