The Saltire Society Design Commendation for the New Daer Viaduct reads ‘It will become the benchmark to which other similar schemes are prepared'. A two-span bridge carrying the West Coast main line over the River Clyde was replaced by a single river span. All construction of the new substructure and superstructure and jacking of the superstructure into its permanent position was carried out below the existing bridge with no disruptive track possession. Only one 42 h possession was utilised to remove the old superstructure and the original central pier and to install minor precast infill units. The superstructure comprised two steel edge through girders supporting a transverse steel composite deck. The edge girders were aligned to pass the ends of the original central pier. When the superstructure was jacked up, the concrete robust kerb and edge girders moved up outboard of the original bridge edge girders. Thus, prior to the possession, the superstructure had all been built except for the portion occupied by the original pier. Following removal of the pier, this portion was completed with a precast concrete unit.
Article navigation
June 2007
Research Article|
June 01 2007
UB 30/274 Daer Viaduct replacement
B. Anderson, BSc, CEng, MICE, FIHT;
B. Anderson, BSc, CEng, MICE, FIHT
Regional Manager
Carillion Regional Civil Engineering
Search for other works by this author on:
R. Rocke, BSc, CEng, MICE
R. Rocke, BSc, CEng, MICE
Associate Director
Faber Maunsell Ltd
Glasgow
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
June 14 2006
Accepted:
March 05 2007
Online ISSN: 1751-7664
Print ISSN: 1478-4637
© 2007 Thomas Telford Ltd
2007
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2007) 160 (2): 65–69.
Article history
Received:
June 14 2006
Accepted:
March 05 2007
Citation
Bell G, Anderson B, Rocke R (2007), "UB 30/274 Daer Viaduct replacement". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 160 No. 2 pp. 65–69, doi: https://doi.org/10.1680/bren.2007.160.2.65
Download citation file:
176
Views
New and popular articles
Suggested Reading
Repair of two riveted steel plate girder railway bridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2011)
The west flyover at Stockley airport junction, London, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (January,2020)
Dubai Metro footbridge design
Proceedings of the Institution of Civil Engineers - Bridge Engineering (February,2011)
Holmestrand, Norway: the world’s first high-speed-rail station under rock
Proceedings of the Institution of Civil Engineers - Civil Engineering (March,2018)
Bridgeworks on the East London railway line extension, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2008)
Related Chapters
UK Implementation of Eurocodes for Bridge Design – An Overview
Bridge Design to Eurocodes: UK Implementation
Eurocode Implementation – The European Context
Bridge Design to Eurocodes: UK Implementation
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
