Burnton railway viaduct in Ayrshire, Scotland, carries the freight-only, single-track Waterside branch line from Dalrymple Junction to Chalmerston coal yard over the Purclewan Burn and the B742. The striking grade ‘B’ listed structure was constructed in 1889, is curved in plan and comprises 16 masonry arch spans. A permanent speed restriction of 5 miles/h had been imposed on the line and the structure was being constantly monitored in real time using accelerometers attached to the arch intrados and the vertical face of the spandrel walls. In 2001 the structure began to exhibit an increase in ‘liveliness' during the passage of the trains. This movement was investigated by Railtrack engineering staff as a matter of urgency. As part of their commitment to maintain the safe and efficient operation of the railway, Railtrack (succeeded by Network Rail) commissioned John Mowlem Ltd (now Carillion JM Ltd), through its alliance contract, to investigate the problem and prepare a cost-effective solution in accordance with the line classification. In turn, Carillion appointed Scott Wilson Scotland Ltd (SWSL) as its designer. Initially, SWSL and Carillion undertook a joint investigation of the viaduct, which was quickly followed by an assessment of the structure. This confirmed that there was a need to undertake a comprehensive programme of strengthening and refurbishment. This paper describes the techniques adopted to stabilise the viaduct and the methods of construction.
Article navigation
September 2007
Research Article|
September 01 2007
The repair and strengthening of Burnton railway viaduct, UK Available to Purchase
W. McQueen, BSc, CEng, MICE;
W. McQueen, BSc, CEng, MICE
Principal Engineer
Scott Wilson Scotland Ltd
Glasgow
Search for other works by this author on:
M. Goodall, BSc, MICE;
M. Goodall, BSc, MICE
Design Manager
Carillion JM Ltd
Glasgow
Search for other works by this author on:
G. Bell, HNC, HND
G. Bell, HNC, HND
Project Manager
Civils, Network Rail
Glasgow
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
September 07 2006
Accepted:
April 16 2007
Online ISSN: 1751-7664
Print ISSN: 1478-4637
© 2007 Thomas Telford Ltd
2007
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2007) 160 (3): 109–116.
Article history
Received:
September 07 2006
Accepted:
April 16 2007
Citation
McQueen W, Goodall M, Bell G (2007), "The repair and strengthening of Burnton railway viaduct, UK". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 160 No. 3 pp. 109–116, doi: https://doi.org/10.1680/bren.2007.160.3.109
Download citation file:
Suggested Reading
Water repellent influence on salt crystallisation in masonry
Proceedings of the Institution of Civil Engineers - Construction Materials (February,2008)
Waterproofing integrity and water tightness of buildings in the tropic
Proceedings of the Institution of Civil Engineers - Forensic Engineering (November,2024)
Appraisal and repair of St Peter’s at the Cross, Chester
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (September,2025)
Structural characteristics analysis of brick–timber buildings built before 1950 in Shanghai
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (February,2025)
A multi-criteria decision-making approach for selecting unburnt materials in green building projects
Proceedings of the Institution of Civil Engineers - Construction Materials (November,2025)
Related Chapters
Tension cables in suspension bridges. A case of form-finding
Tension Structures: Form and behaviour
Introduction
Bridge Construction Equipment
Lord Hill’s Bridge Mitigation Works
Crossrail Project: Infrastructure Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.