The Bahrain Ministry of Works roads directorate and Hyder Consulting undertook a national transport model in 2002 in which traffic congestion was identified and future 2021 traffic flows were estimated. Strategic improvements were identified to improve traffic flow and make allowances for future increases in traffic volumes. The Isa Town Gate interchange was an existing roundabout with a five-leg junction in an urban setting with two major highways: Sheikh Salman Highway and Al Estiqlal Highway. This paper details the design of the £66 million project from concept to tender and also expands on the construction progress. Execution of the project modified the existing Isa Town Gate roundabout into a three-level grade-separated interchange. The option chosen was a three-level grade-separated junction with a free-flow flyover and underpass for the major highway routes. The existing roundabout was replaced with a complex split-traffic signalised junction accommodating all movements. The flyover consisted of two non-parallel curved bridge decks 2·4 km long of glued segmental prestressed concrete viaducts. An overhead launching gantry was specified to minimise traffic management. The underpass was designed as a diaphragm-walled U trough but was later varied to a ground-anchored solution. Construction commenced in October 2007, and is due for completion in mid-2010.
Article navigation
September 2009
Research Article|
September 01 2009
Isa Town Gate interchange, Bahrain
David Yau, MSc, MICE, CEng;
David Yau, MSc, MICE, CEng
1
Project Manager, Hyder Consulting Middle East Limited
Manama, Bahrain
Search for other works by this author on:
J Penny, BSc, EurIng, MICE, MIStructE, CEng
J Penny, BSc, EurIng, MICE, MIStructE, CEng
2
Technical Director, Hyder Consulting Hong Kong
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
January 04 2009
Accepted:
April 14 2009
Online ISSN: 1751-7664
Print ISSN: 1478-4637
© 2009 The authors and the Institution of Civil Engineers
2009
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2009) 162 (3): 127–135.
Article history
Received:
January 04 2009
Accepted:
April 14 2009
Citation
Yau D, Penny J (2009), "Isa Town Gate interchange, Bahrain". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 162 No. 3 pp. 127–135, doi: https://doi.org/10.1680/bren.2009.162.3.127
Download citation file:
New and popular articles
Suggested Reading
Replacement of Sitra bridges: a mega-project for Bahrain
Proceedings of the Institution of Civil Engineers - Civil Engineering (December,2009)
Influence of railway loading on the performance of soil-filled masonry arch bridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (July,2018)
Construction of a concrete segmental arch bridge over a railway
Proceedings of the Institution of Civil Engineers - Bridge Engineering (May,2019)
Design and construction of Loughor railway viaduct with semi-integral abutments
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2018)
New stations in Melbourne, Australia: working in a live rail environment
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2013)
Related Chapters
UK Implementation of Eurocodes for Bridge Design – An Overview
Bridge Design to Eurocodes: UK Implementation
Eurocode Implementation – The European Context
Bridge Design to Eurocodes: UK Implementation
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
