The Severn Bridge, completed in 1966, was the first suspension bridge to adopt a streamlined box girder deck that reduced the dead weight and improved aerodynamic performance. The 988 m span bridge crosses the estuary of the River Severn and is an important asset within the UK highway network. In 2006, the UK's Highways Agency, through the concessionaire Severn River Crossing plc, commissioned a programme of internal intrusive examination of the main suspension cables of the Severn Bridge with Faber-Maunsell/Weidlinger acting as consultants for the inspection. The information obtained during these investigations provided the basic data for use in a formal strength assessment of the suspension cables undertaken by Mott MacDonald, the UK government's representative for the Severn Crossings concession. Analytical techniques developed over the past 3 years have enabled the adoption of limit state principles for the assessment in line with UK practice. In addition, deterioration modelling has been developed to improve understanding of the current condition of the cables and to assist in the future management of the bridge. In parallel with the strength assessment, process maintenance management strategies have been developed and implemented that have enabled the continued safe operation of the bridge.
Article navigation
December 2010
Research Article|
December 01 2010
Inspection and maintenance of Severn Bridge suspension cables
J. S. Young, BSc, CEng, FICE;
J. S. Young, BSc, CEng, FICE
1
Project Director
Mott MacDonald, Croydon
UK
Search for other works by this author on:
M. J. Lynch, BSc, CEng, MICE, MASCE
M. J. Lynch, BSc, CEng, MICE, MASCE
2
Technical Manager, Highways Agency
Bristol
UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
August 20 2010
Accepted:
September 24 2010
Online ISSN: 1751-7664
Print ISSN: 1478-4637
© 2010 The authors and the Institution of Civil Engineers
2010
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2010) 163 (4): 173–180.
Article history
Received:
August 20 2010
Accepted:
September 24 2010
Citation
Young JS, Lynch MJ (2010), "Inspection and maintenance of Severn Bridge suspension cables". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 163 No. 4 pp. 173–180, doi: https://doi.org/10.1680/bren.2010.4.173
Download citation file:
New and popular articles
Suggested Reading
Editorial
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2004)
Erratum: Buffeting reliability of bridges with structural uncertainties
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2015)
Editorial
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2011)
Editorial – Bridge Engineering June 2009
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2009)
Editorial
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2012)
Related Chapters
Definitions
Prestressed Concrete Bridges: Design and Construction
Symbols and notation used
Prestressed Concrete Bridges: Design and Construction
General
Prestressed Concrete Bridges: Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.