In the mid-1800s a number of the early suspension bridges collapsed for various reasons, some with loss of life. In this paper, four collapses caused by pedestrians are re-visited; Broughton and Angers failed when excessive vibrations were imposed by marching troops, Montrose and Yarmouth failed when crowds rushed from one side to the other to watch events passing beneath. It was found that both the failures caused by troops were at the suspension anchorages. Those caused by asymmetric crowd loading were in the main chains at badly forge-welded connections. Poor-quality iron, and shortfalls in design and constructions were identified as contributory causes. In the aftermath of the collapses it was recommended that troops should break step when crossing bridges, structures should be periodically inspected and chains should be load-tested. Unfortunately these actions were not mandatory and an order for troops to break step was the only one to be generally adopted at the time. Various design schemes were adopted to limit vibrations but the single most important was to stiffen decks by the addition of truss-parapets, as adopted by Rendel after Montrose Bridge was damaged by wind in 1838. Dynamically lively bridges continue to be designed to this day, sometimes unwittingly, sometimes knowingly.
Article navigation
June 2011
Research Article|
June 01 2011
Dynamic behaviour and collapses of early suspension bridges
Graham P. Tilly, BSc (Eng), PhD, ACGI, DIC, CEng, FICE
Graham P. Tilly, BSc (Eng), PhD, ACGI, DIC, CEng, FICE
Emeritus Director
Gifford
Southampton, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
March 31 2010
Accepted:
November 09 2010
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2011
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2011) 164 (2): 75–80.
Article history
Received:
March 31 2010
Accepted:
November 09 2010
Citation
Tilly GP (2011), "Dynamic behaviour and collapses of early suspension bridges". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 164 No. 2 pp. 75–80, doi: https://doi.org/10.1680/bren.2011.164.2.75
Download citation file:
New and popular articles
Suggested Reading
Lessons from historical bridge failures
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2008)
Lessons learned from the bridge collapse in Palau
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2008)
A survey of failures of bridge falsework systems since 1970
Proceedings of the Institution of Civil Engineers - Forensic Engineering (November,2012)
London Underground: nineteenth century railway, twenty-first century standards
Proceedings of the Institution of Civil Engineers - Forensic Engineering (May,2011)
Briefing: ASCE forensic engineering symposium
Proceedings of the Institution of Civil Engineers - Forensic Engineering (May,2011)
Related Chapters
The history and aesthetic development of bridges
ICE Manual of Bridge Engineering
UK Implementation of Eurocodes for Bridge Design – An Overview
Bridge Design to Eurocodes: UK Implementation
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.