Supply to internally displaced persons in north-east Democratic Republic of Congo is difficult because of poor roads and the lack of bridges and culverts. Funds became available for construction of 22 short bridges and 28 culverts and repair of three Bailey bridges. The situation presented challenges of insecurity, poor access and communications, limited capacity of the highway authorities, strictly limited funds, poor site information and uncertain quality of materials, supervision and workmanship. This paper records how the project team formulated a project to improve access, identified and overcame the challenges and brought the project to a successful conclusion. It contains a brief review of guidance relating to low-cost bridges, information on the designs chosen and resources used, allowances made for the conditions and lessons learnt to assist engineers working in similar circumstances. The first year's project was successfully completed on time and in budget to the benefit of the local population.
Article navigation
June 2013
Research Article|
May 25 2013
The challenges of humanitarian access bridges in Democratic Republic of Congo
Simon Bird, BSc, MSc, DIC, CEng, MICE;
Simon Bird, BSc, MSc, DIC, CEng, MICE
1
Construction Consultant, Medair, Chemin du Croset 9 – CH-1024 Ecublens, Switzerland, www.medair.org
Search for other works by this author on:
Thomas P. Simon, MSc, MEng, BEng, EMIT, CIWEN Graduate
Thomas P. Simon, MSc, MEng, BEng, EMIT, CIWEN Graduate
2
Project Manager, Medair, RD Congo, Avenue Kasavubu, Boulevard de Libération 66, Bunia, Ituri, RD Congo
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
January 18 2012
Accepted:
February 28 2013
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2013
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2013) 166 (2): 83–94.
Article history
Received:
January 18 2012
Accepted:
February 28 2013
Citation
Bird S, P. Simon T (2013), "The challenges of humanitarian access bridges in Democratic Republic of Congo". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 166 No. 2 pp. 83–94, doi: https://doi.org/10.1680/bren.12.00002
Download citation file:
New and popular articles
Suggested Reading
Rapid visual screening of earthquake-susceptible buildings
Proceedings of the Institution of Civil Engineers - Municipal Engineer (April,2016)
Briefing: Visions of a resilient city
Proceedings of the Institution of Civil Engineers - Urban Design and Planning (December,2013)
Community participation in post-disaster reconstruction
Proceedings of the Institution of Civil Engineers - Municipal Engineer (October,2015)
Managing road transport in a world of changing climate and land use
Proceedings of the Institution of Civil Engineers - Municipal Engineer (June,2015)
Bridging the emergency relief and long-term development gap
Proceedings of the Institution of Civil Engineers - Municipal Engineer (May,2015)
Related Chapters
Case studies
Railway Bridge Maintenance
Introduction
Bridge Construction Equipment
Lord Hill’s Bridge Mitigation Works
Crossrail Project: Infrastructure Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.