Glasgow Central station is one of the busiest railway stations in the UK outside London, with approximately 38 million people using it each year and an average of 1100 trains per day. The original station was opened by the Caledonian Railway in July 1879 and comprises a labyrinth of masonry and brick arches linked by vaulted arches and supported on substantial masonry piers founded in alluvial deposits. In 2009, as part of their continued commitment to improve rail services in Scotland, Network Rail commissioned the construction of two new tracks into the station, the first for 100 years. This presented a significant engineering challenge as the proposed alignment for the new tracks squeezes through the existing narrow masonry arch entrance structure, runs above a line of vaulted arches, which house a nightclub, theatre and restaurant, and is carried over the existing short-stay car park and ramp on a new reinforced concrete bridge. The new structures had to be supported on the existing Victorian infrastructure, demanding innovative, practical design solutions and skilful construction techniques to enable them to be built quickly and safely in a confined, busy public place.
Article navigation
December 2013
Research Article|
December 14 2012
Glasgow Central station: a new bridge, track and platforms Available to Purchase
Mike Hackney, BSc (Hons), CEng, FICE, FIStructE;
Mike Hackney, BSc (Hons), CEng, FICE, FIStructE
Technical Director (Bridges) URS, Glasgow, UK
Search for other works by this author on:
Danny Boothman, BEng (Hons), PhD, MICE, MIStructE;
Danny Boothman, BEng (Hons), PhD, MICE, MIStructE
Principal Engineer (Bridges), URS, Glasgow, UK
Search for other works by this author on:
Stephen Nutley, BEng (Hons);
Stephen Nutley, BEng (Hons)
Project Manager, Balfour Beatty Civil Engineering Ltd, Edinburgh, UK
Search for other works by this author on:
Stephen Brown
Stephen Brown
Project Manager, Network Rail, Glasgow, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
March 31 2011
Accepted:
September 01 2011
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2013
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2013) 166 (4): 262–272.
Article history
Received:
March 31 2011
Accepted:
September 01 2011
Citation
Hackney M, Boothman D, Nutley S, Brown S (2013), "Glasgow Central station: a new bridge, track and platforms". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 166 No. 4 pp. 262–272, doi: https://doi.org/10.1680/bren.11.00021
Download citation file:
Suggested Reading
Design of the Dubai Metro light rail viaducts—superstructure
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2009)
Design of the Dubai Metro light rail viaducts—substructure
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2009)
Transforming delivery of Water Street Bridge abutment in London, UK through innovation
Proceedings of the Institution of Civil Engineers - Civil Engineering (October,2019)
Lessons learned from the bridge collapse in Palau
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2008)
Three-dimensional modelling for seismic assessment of plain concrete arch bridges
Proceedings of the Institution of Civil Engineers - Civil Engineering (February,2018)
Related Chapters
FIELD TRIALS ON COVERCRETE MONITORING SENSORS: A TEMPERATURE CORRECTION PROTOCOL FOR CONDUCTIVITY MEASUREMENTS
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
INTERNATIONAL DEVELOPMENTS IN THE FIELD OF AGEING MANAGEMENT OF NUCLEAR POWER INFRASTRUCTURE
Role of Concrete in Nuclear Facilities
CRITERIA FOR AND PREDICTION OF LIMIT STATES OF DEGRADATION OF REINFORCED CONCRETE STRUCTURES
Role of Concrete in Nuclear Facilities
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
