Bridge D70 is a single-span steel plate girder bridge dating from the 1930s. It carries four tracks of London Underground's District and Piccadilly lines, the latter being one of the capital's main rail links to Heathrow Airport. Situated next to Chiswick Park tube station the bridge spans over a busy traffic route. This paper describes the project as part of the public private partnership contract to modernise the London Underground system. The paper describes the reasons why upgrading of the existing structure was chosen over complete renewal. The primary aims during the works were to avoid unnecessary closure of the railway line, to minimise the risk of unplanned disruption and to protect the safety of the travelling public. The paper explains the method of construction and the constraints on carrying out work to an existing bridge while in service to passenger trains. This required the extensive use of temporary works to support the tracks. It also describes the challenges in refurbishing a bridge in a residential area in terms of access to the site and reducing the environmental impact of the work. The designer and project manager was Metronet Rail SSL, and the main contractor was Edmund Nuttall (BAM Nuttall).
Article navigation
December 2014
Research Article|
November 22 2012
Upgrade of London Underground Bridge D70: Chiswick Park Available to Purchase
Karl Chan, MSc, CEng, MICE
Karl Chan, MSc, CEng, MICE
Bridges and Structures Engineer, London Underground, Transport for London, London, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 05 2011
Accepted:
February 23 2012
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2014
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2014) 167 (4): 315–325.
Article history
Received:
July 05 2011
Accepted:
February 23 2012
Citation
Chan K (2014), "Upgrade of London Underground Bridge D70: Chiswick Park". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 167 No. 4 pp. 315–325, doi: https://doi.org/10.1680/bren.11.00037
Download citation file:
Suggested Reading
Briefing: Risk management critical to Crossrail’s success
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2011)
Getting the East London line railway project, UK, into passenger service
Proceedings of the Institution of Civil Engineers - Transport (February,2013)
Mantra to method: lessons from managing innovation on Crossrail, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering (August,2015)
Asset creation team rationalities and strategic discourses: evidence from India
Infrastructure Asset Management (February,2021)
Railway infrastructure portfolio management in the UK
Infrastructure Asset Management (March,2020)
Related Chapters
The Role of Operations in a Mega Project
Crossrail Project: Infrastructure Design and Construction
Case studies
Programme Management in Construction
Introduction
FIDIC 2017: The Contract Manager’s Handbook
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.