Yarra Bridge and Gardiners Creek viaduct together form a major elevated structure in the Melbourne CityLink toll-way: the busiest route in the Victorian freeway system. Originally constructed in the 1960s, they have been twice widened and modified extensively. The original structures recently required to be upgraded to withstand current and anticipated future loading. This paper discusses the viaduct's load rating by way of a combination of analytical assessment and observation of the structures' actual condition followed by the development of preferred strengthening concepts in conjunction with the contractor and asset owner. The methods used, including concrete infill, carbon-fibre strengthening and external post-tensioning, were designed to be flexible so they could be modified where ‘as-constructed’ details were found to differ from the original design drawings. Remedial works were also designed to be carried out below deck level, avoiding disruption to toll-way traffic while minimising the impact on stakeholders below.
Article navigation
December 2016
Research Article|
September 09 2015
Assessment and strengthening of a Melbourne toll-way viaduct
Louis Walsh, BEng, PhD, MBA, CEng, MICE, FIEAust
Louis Walsh, BEng, PhD, MBA, CEng, MICE, FIEAust
Technical Director (Transportation)
AECOM, Melbourne, Australia
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
May 30 2014
Accepted:
July 21 2015
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2015
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2016) 169 (4): 245–259.
Article history
Received:
May 30 2014
Accepted:
July 21 2015
Citation
Walsh L (2016), "Assessment and strengthening of a Melbourne toll-way viaduct". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 169 No. 4 pp. 245–259, doi: https://doi.org/10.1680/bren.14.00020
Download citation file:
Suggested Reading
Design of the Dubai Metro light rail viaducts—superstructure
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2009)
Design of the Dubai Metro light rail viaducts—substructure
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2009)
Jacked installation of underbridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (November,2017)
Behaviour of post-tensioned concrete box girders
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2004)
Assessment testing Mizen Head Footbridge, Ireland
Proceedings of the Institution of Civil Engineers - Bridge Engineering (September,2004)
Related Chapters
FIELD TRIALS ON COVERCRETE MONITORING SENSORS: A TEMPERATURE CORRECTION PROTOCOL FOR CONDUCTIVITY MEASUREMENTS
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
INTERNATIONAL DEVELOPMENTS IN THE FIELD OF AGEING MANAGEMENT OF NUCLEAR POWER INFRASTRUCTURE
Role of Concrete in Nuclear Facilities
CRITERIA FOR AND PREDICTION OF LIMIT STATES OF DEGRADATION OF REINFORCED CONCRETE STRUCTURES
Role of Concrete in Nuclear Facilities
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
