The A82 is a primary route in Scotland that follows the shoreline of Loch Lomond. Following a landslide in the late 1970s, traffic lights were implemented, limiting vehicles to one-way traffic. A widening scheme was required to restore the two-way carriageway over a 400 m length. This scheme included a six-span 168 m viaduct curved in plan to follow the existing road alignment. The form of the structure was highly influenced by the site topography, the adjacent soil/rock slope profile and the loch shoreline. It aimed to provide an economical, buildable solution while minimising intrusion into the sensitive environment and minimising traffic disruption during construction. To meet these criteria, the design was developed to suit a phased construction. A full-length contiguous piled retaining wall supported the existing carriageway and facilitated installation of a trapezoidal steel–concrete composite box-girder viaduct. Partial construction of the deck slab allowed a temporary switch of traffic, enabling the remainder of the bridge works to be completed on the original road alignment. Once constructed, the 3000 t deck was jacked-up to its permanent position using 82 synchronised hydraulic cylinders. This paper summarises how design and construction of the viaduct was achieved in its challenging environment.
Article navigation
June 2018
Research Article|
November 10 2017
An unconventional viaduct design for the A82 road widening
Riccardo Stroscio, BEng, MSc, CEng, MIStructE
;
Riccardo Stroscio, BEng, MSc, CEng, MIStructE
Associate
Tony Gee and Partners, Esher, UK (corresponding author: riccardo.stroscio@tonygee.com)
Search for other works by this author on:
Jaime MacCombe, MEng, CEng, MICE;
Jaime MacCombe, MEng, CEng, MICE
Senior Engineer
Tony Gee and Partners, Esher, UK
Search for other works by this author on:
Andy Casewell, MEng, CEng, MICE;
Andy Casewell, MEng, CEng, MICE
Structures Group Director
Tony Gee and Partners, Esher, UK
Search for other works by this author on:
Mike Francescon, BA(Cantab), PhD, CEng, MICE, FGS
Mike Francescon, BA(Cantab), PhD, CEng, MICE, FGS
Geotechnical Director
Tony Gee and Partners, Esher, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
December 02 2016
Accepted:
October 17 2017
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2017
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2018) 171 (2): 127–140.
Article history
Received:
December 02 2016
Accepted:
October 17 2017
Citation
Stroscio R, MacCombe J, Casewell A, Francescon M (2018), "An unconventional viaduct design for the A82 road widening". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 171 No. 2 pp. 127–140, doi: https://doi.org/10.1680/jbren.16.00039
Download citation file:
New and popular articles
Suggested Reading
Design and construction of a railway flyover at Hitchin, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2015)
Launched north approach viaduct in the new Queensferry crossing, UK: design and construction
Proceedings of the Institution of Civil Engineers - Bridge Engineering (October,2018)
Launched south approach viaduct in the Queensferry Crossing, UK: design and construction
Proceedings of the Institution of Civil Engineers - Bridge Engineering (October,2018)
The replacement of Barmouth viaduct metallics: from concept to construction
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2026)
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Related Chapters
Shenzhen Western Corridor
Role of Concrete Bridges in Sustainable Development: Proceedings of the International Symposium held at the University of Dundee, Scotland, UK on 3–4 September 2003
Boston Central Artery/Tunnel Project: Innovative Use of Precast Segmental Technology
Role of Concrete Bridges in Sustainable Development: Proceedings of the International Symposium held at the University of Dundee, Scotland, UK on 3–4 September 2003
FAST TRACK DESIGN AND CONSTRUCTION OF CONCRETE BRIDGES
Concrete for Transportation Infrastructure: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.