The new Queensferry Crossing in Scotland, UK, is a durable structure designed to minimise degradation and withstand the challenging environment of the Forth estuary. High-performance materials, rigorous compliance testing and advanced protective measures have been employed to this end. An effective, integrated monitoring, inspection and maintenance system was developed to facilitate early intervention and maintain the bridge in a sustainable condition. A range of access facilities, including motorised gantries, shuttle trains and mechanical lifts have been provided to ensure safe and effective access, within touching distance, to all internal and external surfaces. An advanced structural health monitoring system has been installed to monitor the condition and integrity of the bridge, allowing rapid evaluation of structural integrity after extreme events and the identification of changes in condition over time.
Article navigation
June 2019
Research Article|
May 13 2019
Queensferry Crossing, UK: durability, maintenance, inspection and monitoring
Oliver Riches;
Oliver Riches
Associate Director, Arup, Edinburgh, UK (corresponding author: oliver.riches@arup.com)
Search for other works by this author on:
Chris Hill;
Chris Hill
Senior Engineer, Arup, Edinburgh, UK
Search for other works by this author on:
Paul Baralos
Paul Baralos
Senior Engineer, Arup, London, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
February 26 2018
Accepted:
March 08 2019
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2019
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2019) 172 (2): 175–188.
Article history
Received:
February 26 2018
Accepted:
March 08 2019
Citation
Riches O, Hill C, Baralos P (2019), "Queensferry Crossing, UK: durability, maintenance, inspection and monitoring". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 172 No. 2 pp. 175–188, doi: https://doi.org/10.1680/jbren.18.00020
Download citation file:
New and popular articles
Suggested Reading
Design of the Dubai Metro light rail viaducts—superstructure
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2009)
Design of the Dubai Metro light rail viaducts—substructure
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2009)
Ultimate strength of externally strengthened prestressed beams
Proceedings of the Institution of Civil Engineers - Structures and Buildings (November,2002)
Seismic fragility analysis of concrete bridges subjected to far- and near-field records
Proceedings of the Institution of Civil Engineers - Structures and Buildings (March,2021)
Simulation of self-centring fibre-reinforced concrete columns
Proceedings of the Institution of Civil Engineers - Engineering and Computational Mechanics (June,2008)
Related Chapters
INTERNATIONAL DEVELOPMENTS IN THE FIELD OF AGEING MANAGEMENT OF NUCLEAR POWER INFRASTRUCTURE
Role of Concrete in Nuclear Facilities
FIELD TRIALS ON COVERCRETE MONITORING SENSORS: A TEMPERATURE CORRECTION PROTOCOL FOR CONDUCTIVITY MEASUREMENTS
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
CRITERIA FOR AND PREDICTION OF LIMIT STATES OF DEGRADATION OF REINFORCED CONCRETE STRUCTURES
Role of Concrete in Nuclear Facilities
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
