The historic Old Tweed Bridge is a three-span listed masonry arch crossing the River Tweed. Structural integrity concerns resulted in the bridge being temporarily closed to the public and propped. This paper discusses the challenges associated with the construction works necessary to refurbish the bridge permanently. The works involved installing a temporary propping and encapsulation structure, excavating the bridge infill, taking down and rebuilding the walls, casting a concrete saddle above the arches, waterproofing and resurfacing. Other innovative works involved closing the gap between the voussoirs and arch barrel using a bespoke arch pulling system and repairing voussoir stones in situ with a lime-based material. There were significant environmental challenges on the project as the bridge is located in an ecologically sensitive area. The River Tweed is one of the UK's great salmon rivers, which restricted working in the river and required strict pollution controls. Alternative roosts for bats were provided and netting was required around the bridge as part of an advanced works contract to mitigate the risk of birds nesting in the bridge.
Article navigation
December 2019
Research Article|
July 15 2019
Refurbishing the historic Old Tweed Bridge, Scotland – the challenges and innovations Available to Purchase
Andrew Grubb, BSc (Hons), IEng, MICE
;
Andrew Grubb, BSc (Hons), IEng, MICE
Senior Civil Engineer, Amey Consulting, Edinburgh, UK (corresponding author: andrew.grubb@amey.co.uk)
Search for other works by this author on:
Kieran O'Connor, MEng, CEng, MICE
;
Kieran O'Connor, MEng, CEng, MICE
Technical Director, Amey Consulting, Edinburgh, UK
Search for other works by this author on:
Hazel McDonald, BEng (Hons), PhD, CEng, FICE
Hazel McDonald, BEng (Hons), PhD, CEng, FICE
Chief Bridge Engineer, Transport Scotland, Glasgow, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
November 23 2018
Accepted:
June 20 2019
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2019
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2019) 172 (4): 314–323.
Article history
Received:
November 23 2018
Accepted:
June 20 2019
Citation
Grubb A, O'Connor K, McDonald H (2019), "Refurbishing the historic Old Tweed Bridge, Scotland – the challenges and innovations". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 172 No. 4 pp. 314–323, doi: https://doi.org/10.1680/jbren.18.00065
Download citation file:
Suggested Reading
Mechanically laminated timber arched suspension bridge
Proceedings of the Institution of Civil Engineers - Structures and Buildings (July,2014)
An innovative opening mechanism for a footbridge
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2011)
Modular by necessity – Bracklinn Falls footbridge
Proceedings of the Institution of Civil Engineers - Bridge Engineering (November,2024)
Development of portable footbridges for disaster relief
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2015)
Steel bridge design and construction: a Southern African experience
Proceedings of the Institution of Civil Engineers - Bridge Engineering (February,2015)
Related Chapters
Influence of self-compacting concrete on the lateral pressure on formwork
ICE Themes Self-Compacting Concrete
Introduction
Bridge Construction Equipment
Definitions
Prestressed Concrete Bridges: Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.