The Jinsha River rail–road double-deck arch bridge (bridge designed to 250 km/h) of the Chengdu–Guiyang high-speed railway (HSR) (designed to 350 km/h) is a complex system with a novel structure in China. The upper deck carries a four-track railway while the lower deck carries a six-lane urban expressway, with a height difference of 32 m. The bridge is located in the mountainous river reach of the city of Yibin. The 336 m main span adopts a high-pier, rigid steel frame, parallel tied-arch structure, built using cantilevers and temporary stay cables with the cable crane method. The 116 m and 120 m side-arches are reinforced concrete, simply-supported, basket-lifting tied-arches built by the mass cast in situ method. The rare layered structure gathers different arch types (top-bared, bottom-bared and half-through arches) into one bridge, which brought significant challenges to its design and construction. Other innovative solutions included flexible hangers passing through rigid hangers for the layered stiffening decks, ultra-high-performance concrete for the steel orthotropic deck road pavement and the use of boat shipments to overcome the scarce availability of flat land at the site. This paper describes some of the salient design and construction challenges of this landmark structure, the world's first double-deck HSR arch bridge.
Article navigation
September 2020
Research Article|
June 29 2020
Jinsha River Bridge, China: the world's first double-deck road and high-speed railway arch bridge Available to Purchase
Yan Zhe Li;
Yan Zhe Li
China Railway Major Bridge Engineering Group Co., Ltd, Wuhan, China (corresponding author: 1144368330@qq.com)
Search for other works by this author on:
Hai Hong Li;
Hai Hong Li
China Railway Major Bridge Engineering Group Co., Ltd, Wuhan, China
Search for other works by this author on:
Bo Ao Xu
Bo Ao Xu
China Railway Major Bridge Engineering Group Co., Ltd, Wuhan, China
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
May 28 2019
Accepted:
April 28 2020
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2020
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2020) 173 (3): 179–189.
Article history
Received:
May 28 2019
Accepted:
April 28 2020
Citation
Li YZ, Li HH, Xu BA (2020), "Jinsha River Bridge, China: the world's first double-deck road and high-speed railway arch bridge". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 173 No. 3 pp. 179–189, doi: https://doi.org/10.1680/jbren.19.00031
Download citation file:
Suggested Reading
Contribution of tracks to dynamic behaviour of railway bridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (September,2018)
Assessing compaction of existing railway subgrades using dynamic cone penetration testing
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (December,2020)
Measurement of rail deflection on soft subgrades using DIC
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (March,2016)
Railway embankment stabilisation: economical asset management
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (February,2018)
Slope stabilisation of railway embankments over loose subgrades using deep-mixed columns
Proceedings of the Institution of Civil Engineers - Ground Improvement (September,2022)
Related Chapters
Railway tracks
Handbook of Geosynthetic Engineering: Geosynthetics and their applications
UK Implementation of Eurocodes for Bridge Design – An Overview
Bridge Design to Eurocodes: UK Implementation
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.