To overcome poor construction conditions, shorten construction time and improve project quality, the construction of Yushan Bridge in China is a fully industrialised, based on prefabrication of key components, site installation. The navigation span of the Yushan Bridge has a main span of 260 m and is the world's first segmented precast steel–concrete composite continuous-beam bridge. A new type of steel–concrete composite segment (a girder that connects the concrete box girders and the steel box girders) is used to ensure the bearing capacity and precision of closure. Thickened-edge U-shaped ribs and ultra-high-toughness concrete pavings are employed together to improve the durability of the orthotropic deck. A single-pile and single-column foundation is fully employed, with a maximum diameter of the steel composite pile (a pile that is outside is steel pipe, and the interior is filled with concrete) of 5 m. It is found that the construction time is reduced by 40%, the wave flow force is decreased by 80%, the scouring depth is decreased by 20% and the cost is reduced by 30% compared with group pilings. In addition, this method avoids durability problems of the pile cap due to group pilings. The use of a prefabricated exterior shell with cast-on-site concrete for the interior pier-top blocks of the 50 m non-navigation span solves the problems associated with the bearing force, durability, construction availability and quality control of the pier-top block.
Article navigation
March 2021
Research Article|
October 15 2019
Innovative accelerated construction method for Yushan Bridge, China
Chang-jiang Wang;
Chang-jiang Wang
Professoriate Senior Engineer, Zhejiang Provincial Institute of Communications Planning, Design and Research Co., Ltd, Hangzhou, P. R. China
Search for other works by this author on:
Lei Li;
Lei Li
Senior Engineer, Zhejiang Provincial Institute of Communications Planning, Design and Research Co., Ltd, Hangzhou, P. R. China (corresponding author: 160711446@qq.com)
Search for other works by this author on:
Xiang-yang Chen;
Xiang-yang Chen
Professoriate Senior Engineer, Zhejiang Provincial Institute of Communications Planning, Design and Research Co., Ltd, Hangzhou, P. R. China
Search for other works by this author on:
Yu-dong Bai
Yu-dong Bai
Senior Engineer, Zhejiang Provincial Institute of Communications Planning, Design and Research Co., Ltd, Hangzhou, P. R. China
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
April 30 2019
Accepted:
September 03 2019
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2019
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2021) 174 (1): 45–55.
Article history
Received:
April 30 2019
Accepted:
September 03 2019
Citation
Wang C, Li L, Chen X, Bai Y (2021), "Innovative accelerated construction method for Yushan Bridge, China". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 174 No. 1 pp. 45–55, doi: https://doi.org/10.1680/jbren.19.00020
Download citation file:
New and popular articles
Suggested Reading
Editorial
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2004)
Erratum: Buffeting reliability of bridges with structural uncertainties
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2015)
Editorial
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2011)
Editorial – Bridge Engineering June 2009
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2009)
Editorial
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2012)
Related Chapters
Tension cables in suspension bridges. A case of form-finding
Tension Structures: Form and behaviour
Definitions
Prestressed Concrete Bridges: Design and Construction
Symbols and notation used
Prestressed Concrete Bridges: Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.