The Humber Bridge is an iconic Grade 1 listed structure, which remains one of the longest single-span suspension bridges in the world. It has a main span of 1410 m and a total span length of 2220 m. The bridge deck is connected to the main suspension cables by spiral wire rope hangers with socketed end connections. In this paper, the global analysis of the bridge is discussed to identify the predicted stresses in the hangers, which was complicated by the triangulation of the hangers. The paper then covers the selection of three trial hangers to be replaced, the specification of the replacement hangers and the testing specified to determine the residual life of the original hangers. The design, fabrication and installation of the works involved in replacing the hangers is described and the paper concludes with a discussion of the results of the hanger testing and how this has informed the strategy for management of the remaining hangers.
Article navigation
December 2021
Research Article|
August 31 2021
Humber Bridge hanger replacements and testing Available to Purchase
Andrew Arundel, BEng (Hons), CEng, FICE
;
Andrew Arundel, BEng (Hons), CEng, FICE
Chief Operating Officer at Humber Bridge Board, E Riding of Yorkshire, UK
Search for other works by this author on:
David Bishop, MEng (Hons), CEng, MIStructE, MICE
;
David Bishop, MEng (Hons), CEng, MIStructE, MICE
Principal Engineer, Atkins SNC-Lavalin, Edinburgh, UK (corresponding author: david.bishop@atkinsglobal.com)
Search for other works by this author on:
Chris R. Hendy, MA(Cantab), CEng, FREng, FICE, Eur Ing
;
Chris R. Hendy, MA(Cantab), CEng, FREng, FICE, Eur Ing
Head of Bridge Engineering, Atkins SNC-Lavalin, Epsom, UK
Search for other works by this author on:
Chris Mundell, MEng (Hons), PhD, CEng, MICE
Chris Mundell, MEng (Hons), PhD, CEng, MICE
Head of Civil Engineering Structures, Atkins SNC-Lavalin, Bristol, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
May 20 2021
Accepted:
May 20 2021
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2021
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2021) 174 (4): 241–253.
Article history
Received:
May 20 2021
Accepted:
May 20 2021
Citation
Arundel A, Bishop D, Hendy CR, Mundell C (2021), "Humber Bridge hanger replacements and testing". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 174 No. 4 pp. 241–253, doi: https://doi.org/10.1680/jbren.20.00042
Download citation file:
Suggested Reading
Analytical fatigue assessment of riveted rail bridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (September,2006)
The behaviour of shear connections in a composite beam with a full-depth precast slab
Proceedings of the Institution of Civil Engineers - Structures and Buildings (February,2000)
Experimental study of fatigue properties of orthotropic steel deck with U-shaped stiffeners
Proceedings of the Institution of Civil Engineers - Structures and Buildings (April,2019)
Modelling a steel-plate girder bridge strengthened with carbon-fibre reinforced polymer
Proceedings of the Institution of Civil Engineers - Structures and Buildings (January,2021)
Fatigue experiment of sectional integrated model of a suspension bridge
Proceedings of the Institution of Civil Engineers - Structures and Buildings (September,2018)
Related Chapters
Widening the Huey P. Long Bridge
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Data Quality and Completeness Issues in Multiday or Panel Surveys
Transport Survey Methods: Best Practice for Decision Making
Introduction
Bridge Construction Equipment
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
