With daily traffic of 260 000 vehicles, the San Francisco–Oakland Bay Bridge is a major connection in the San Francisco Bay area (CA, USA). The new bridge is a designated lifeline structure (to remain open for emergency traffic after a major seismic event) with a design life of 150 years. The new bridge is 3.6 km long and consists of four distinct structures: a low-rise post-tensioned concrete box girder near the Oakland shore; a 2.4 km long segmental concrete box girder (skyway); a first-of-its-kind self-anchored suspension (SAS) bridge with a 385 m main span over the navigational channel; and a post-tensioned concrete box girder that connects to the east portal of the Yerba Buena Island tunnel. Opened in 2013, the signature span of the bridge is the SAS bridge with a length of 624 m and a total deck width of 79 m accommodating ten lanes of traffic in addition to a bike/pedestrian path. The US$6.4 billion megaproject was procured under multiple contracts and was delivered using the traditional design–bid–build method. This paper describes the key design innovations and construction methods which address the unique challenges on this project.
Article navigation
21 December 2023
Research Article|
June 10 2022
The San Francisco–Oakland Bay Bridge, CA, USA – eastern span Available to Purchase
Marwan Nader, PhD, PE, P.Eng, Ing
;
Marwan Nader, PhD, PE, P.Eng, Ing
Senior Vice President and Chief Bridge Engineer, T.Y. Lin International, San Francisco, CA, USA (corresponding author: marwan.nader@tylin.com)
Search for other works by this author on:
Brian Maroney, PhD, PE
Brian Maroney, PhD, PE
Toll Bridge Seismic Retrofit Program Chief Bridge Engineer (retired), California Department of Transportation (Caltrans), Sacramento, CA, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
October 16 2021
Accepted:
April 22 2022
Online ISSN: 1751-7664
Print ISSN: 1478-4637
Emerald Publishing Limited: All rights reserved
2022
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2023) 176 (4): 250–259.
Article history
Received:
October 16 2021
Accepted:
April 22 2022
Citation
Nader M, Maroney B (2023), "The San Francisco–Oakland Bay Bridge, CA, USA – eastern span". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 176 No. 4 pp. 250–259, doi: https://doi.org/10.1680/jbren.21.00078
Download citation file:
1,361
Views
Suggested Reading
A case study on the P–Δ effect on inelastic seismic behaviour of a bridge pier
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2013)
Longitudinal-direction design of buckling-restrained braces in resilient multi-span bridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (September,2024)
Simulation of self-centring fibre-reinforced concrete columns
Proceedings of the Institution of Civil Engineers - Engineering and Computational Mechanics (June,2008)
The response of Karnali Bridge, Nepal to near-fault earthquakes
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2012)
Performance-based seismic design of a continuous bridge
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2008)
Related Chapters
FAST TRACK DESIGN AND CONSTRUCTION OF CONCRETE BRIDGES
Concrete for Transportation Infrastructure: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
UK Implementation of Eurocodes for Bridge Design – An Overview
Bridge Design to Eurocodes: UK Implementation
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.