Opened to traffic on 1 July 2019, the new Samuel De Champlain Bridge represents one of the largest infrastructure projects in North America. The rapidly deteriorating condition of the original Champlain Bridge in Montréal led the Government of Canada to accelerate its replacement and ultimately awarded a contract to the Signature on the Saint Lawrence Group, in 2015, to deliver a new replacement crossing. The project was fast-tracked, with a schedule of only 48 months from design to bridge opening. Due to its geographical location, this lifeline structure faces unique hazards including extreme cold temperatures, ice abrasion, de-icing salt attacks, wind, vessel collision, scour and seismic, while meeting its design life of 125 years. Sustainability and durability are also important project requirements. The 3.4 km long bridge is comprised of three independent structures: the 529 m long, asymmetric cable-stayed bridge (which features a single 169 m high tower), the 762 m long east approach and the 2044 m long west approach. The owner used a public–private partnership procurement model and the project was delivered using the design–build delivery method. An overview of this Can$2.4 billion mega project is provided in this paper, and the design and build solutions to overcome the suite of technical and schedule challenges are discussed.
Article navigation
21 December 2023
Research Article|
November 11 2022
The new Samuel De Champlain Bridge, Canada Available to Purchase
Marwan Nader, PhD, PE, PEng, Ing
;
Marwan Nader, PhD, PE, PEng, Ing
Senior Vice President and Chief Bridge Engineer, T.Y. Lin International, San Francisco, CA, USA (corresponding author: marwan.nader@tylin.com)
Search for other works by this author on:
Guy Mailhot, Eng, MEng, FCSCE, FEIC
Guy Mailhot, Eng, MEng, FCSCE, FEIC
Chief Engineer, Infrastructure Canada, Montréal, Canada
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
October 16 2021
Accepted:
October 11 2022
Online ISSN: 1751-7664
Print ISSN: 1478-4637
Emerald Publishing Limited: All rights reserved
2022
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2023) 176 (4): 294–303.
Article history
Received:
October 16 2021
Accepted:
October 11 2022
Citation
Nader M, Mailhot G (2023), "The new Samuel De Champlain Bridge, Canada". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 176 No. 4 pp. 294–303, doi: https://doi.org/10.1680/jbren.21.00079
Download citation file:
Suggested Reading
Analyses of a composite bowstring truss with tension stiffening
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2003)
An integral composite bridge of high skew
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2003)
Briefing: Innovative design of semi-integral bridges on the new A428
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2008)
Application of partnering principles to a framework contract
Proceedings of the Institution of Civil Engineers - Municipal Engineer (September,2007)
Planning and design of the Gordie Howe International Bridge, North America
Proceedings of the Institution of Civil Engineers - Bridge Engineering (January,2023)
Related Chapters
USE OF COMPOSITE STRUCTURES IN A BUILDING ABOVE A METRO STATION
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
Social Entrepreneurship as a Success Factor in Public–Private Partnerships: Three Case Studies from Pakistan
The Emerald Handbook of Public–Private Partnerships in Developing and Emerging Economies: Perspectives on Public Policy, Entrepreneurship and Poverty
The Degree of Private Participation in PPPs: Evidence from Developing and Emerging Economies
The Emerald Handbook of Public–Private Partnerships in Developing and Emerging Economies: Perspectives on Public Policy, Entrepreneurship and Poverty
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.