The Bukit Panjang light rapid transit (LRT) system, a groundbreaking project for the Land Transport Authority of Singapore, was designed to serve as a feeder to the existing mass rapid transit network and the Bukit Panjang bus interchange. The main civil engineering elements consist of 7·8 km of twin-track elevated guideway, 14 stations and a maintenance depot with an operation control centre. The system was completed and opened to the public in November 1999. This paper discusses the design and construction of the LRT guideway, which consists mainly of precast prestressed concrete segmental box girder bridges with epoxy glued joints and internally prestressed tendons. The bridge decks are predominantly simply supported spans ranging from15 to 34 m; however, a few special decks are made continuous due to stability requirements. Two overhead launching girders were employed for erecting the guideway. Due to specific site constraints and system requirements, the alignment was characterised by numerous tight curves with a minimum horizontal radius of 60 m. The geometry control method and construction equipment, such as the casting cells and the launching girders, were tailor-made in order to tackle the unconventional situation. Some operation and maintenance aspects of the system are also covered in this paper.
Article navigation
Research Article|
January 01 2009
Design and construction of Bukit Panjang LRT, Singapore
Yew Wah Leung, MPhil, CEng, MICE, ACGI, MHKIE;
Yew Wah Leung, MPhil, CEng, MICE, ACGI, MHKIE
YWL Engineering Pte, Singapore
Search for other works by this author on:
Jon S. Button, BSc, CEng, FICE, ACGI;
Jon S. Button, BSc, CEng, FICE, ACGI
Gammon Construction, Singapore
Search for other works by this author on:
Andrew Y. Y. Yap, BEng, MIE(Australia);
Andrew Y. Y. Yap, BEng, MIE(Australia)
Land Transport Authority, Singapore
Search for other works by this author on:
Kee Nam Ng, MSc, PE;
Kee Nam Ng, MSc, PE
Land Transport Authority, Singapore
Search for other works by this author on:
Lijun Shen
Lijun Shen
National University of Singapore
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1755-0904
Print ISSN: 1755-0890
© Thomas Telford and ICE
2009
Civil Engineering Innovation (2009) 3 (1): 33–48.
Citation
Leung YW, Button JS, Yap AYY, Ng KN, Shen L (2009), "Design and construction of Bukit Panjang LRT, Singapore". Civil Engineering Innovation, Vol. 3 No. 1 pp. 33–48, doi: https://doi.org/10.1680/jciei.2009.3.1.33
Download citation file:
Suggested Reading
Design and construction of Bukit Panjang LRT, Singapore
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2008)
Channel Tunnel Rail Link section 1: Medway viaduct
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2003)
Briefing: Limit states design of railway concrete sleepers
Proceedings of the Institution of Civil Engineers - Transport (May,2012)
Using steel and polypropylene fibres to improve the performance of concrete sleepers
Proceedings of the Institution of Civil Engineers - Structures and Buildings (May,2019)
Channel Tunnel Rail Link section 2: Thames tunnel
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2007)
Related Chapters
INTERNATIONAL DEVELOPMENTS IN THE FIELD OF AGEING MANAGEMENT OF NUCLEAR POWER INFRASTRUCTURE
Role of Concrete in Nuclear Facilities
FIELD TRIALS ON COVERCRETE MONITORING SENSORS: A TEMPERATURE CORRECTION PROTOCOL FOR CONDUCTIVITY MEASUREMENTS
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
CRITERIA FOR AND PREDICTION OF LIMIT STATES OF DEGRADATION OF REINFORCED CONCRETE STRUCTURES
Role of Concrete in Nuclear Facilities
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.