The £673 million Olympic Park structures, bridges and highways project is one of the largest for the London 2012 Olympic and Paralympic Games. It involved delivering 29 bridges and underpasses, 20 km of highways, 16 km of perimeter security fencing, 11 km of retaining walls and 24 games-time operational support areas. Significant design and construction achievements were realised despite a challenging programme, lengthy procurement process and coordination with multiple stakeholders. Designs were developed to high aesthetic standards incorporating innovative approaches, structural forms and unconventional materials while meeting the challenges of constructability and phasing. Given the presence of multiple contractors, efficient management of site logistics and construction programming was essential for safe and effective delivery.
Article navigation
November 2011
Research Article|
November 01 2011
Delivering London 2012: structures, bridges and highways
David Baird, MSc, CEng, MICE;
David Baird, MSc, CEng, MICE
1
is Olympic Delivery Authority project sponsor, infrastructure
Search for other works by this author on:
Mark Thurston, MSc, IEng, MAPM;
Mark Thurston, MSc, IEng, MAPM
2
was CLM head of structures, bridges and highways
Search for other works by this author on:
Chris Triggs, CEng, MICE;
Chris Triggs, CEng, MICE
3
is CLM design manager for infrastructure
Search for other works by this author on:
Hugh Corrigan, MSc, Eng, MICE, MCIMEM;
Hugh Corrigan, MSc, Eng, MICE, MCIMEM
4
is Atkins design leader
Search for other works by this author on:
Stephanos Samaras, DIC, CEng, MIStuctE
Stephanos Samaras, DIC, CEng, MIStuctE
5
is Arup design leader
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1751-7672
Print ISSN: 0965-089X
ICE Publishing: All rights reserved
2011
Proceedings of the Institution of Civil Engineers - Civil Engineering (2011) 164 (6): 23–29.
Citation
Baird D, Thurston M, Triggs C, Corrigan H, Samaras S (2011), "Delivering London 2012: structures, bridges and highways". Proceedings of the Institution of Civil Engineers - Civil Engineering, Vol. 164 No. 6 pp. 23–29, doi: https://doi.org/10.1680/cien.2011.164.6.23
Download citation file:
New and popular articles
Suggested Reading
Delivering London 2012: site-wide logistics
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (August,2013)
Briefing: Groundwater treatment on the Olympic Park
Proceedings of the Institution of Civil Engineers - Water Management (September,2012)
Briefing: London 2012 Olympic Park transport and environmental management schemes
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (June,2012)
London 2012 legacy: putting London Underground on a new track
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2014)
London 2012 legacy: managing flood risk at Queen Elizabeth Olympic Park
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2014)
Related Chapters
The 2010 Olympic and Paralympic Winter Games
Contemporary Destination Governance: A Case Study Approach
Reflections on an Attempt to Do “Environmental Sports Journalism”: The Behind-the-Scenes Story of the Documentary Mount Gariwang: An Olympic Casualty
Sport and the Environment: Politics and Preferred Futures
Authentic Sports Branding in the Digital Age
Cultures of Authenticity
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.