Article navigation

Completed in 2016, Chaoyang Bridge in China is the world’s first double-deck composite girder cable-stayed bridge with corrugated steel webs. It provides a dual four-lane highway above with cantilevered footways and cycleways below. As described in this paper, the bridge features several design innovations. These include the first use of corrugated steel webs for a cable-stayed double-deck crossing, new cable anchorage technology and a building information modelling management system to resolve structural defects.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close subscription notice
Close access options