The Patchway rail tunnels in Bristol were a major obstacle to the £3 billion electrification of the Great Western railway between London and south Wales, completed in December 2019. The tracks in the three nineteenth-century brick-arch tunnels needed to be lowered to provide the required clearances for new overhead line equipment. Extensive surveys, stability analyses and strengthening measures were undertaken to ensure structural integrity was maintained during the track lowering. An overhead conductor bar was developed specifically for the tunnels to reduce the lowering required. Further innovation included specially adapted drilling rigs to enable the efficient installation of tunnel fixings. This paper focuses on the civil engineering aspects of the project, with an overview of the electrification design to demonstrate how the overall integrated solution was achieved.
Article navigation
1 November 2020
Research Article|
July 31 2020
Great Western railway electrification, UK: Patchway tunnels
Nigel Fletcher, BSc, CEng, FICE;
Arup, Bristol, UK
(corresponding author)
Search for other works by this author on:
Matthew Brown, MEng, CEng, MICE;
Matthew Brown, MEng, CEng, MICE
Senior Engineer
Arup, Bristol, UK
Search for other works by this author on:
Tarek Sadek, PhD, CEng, MICE
Tarek Sadek, PhD, CEng, MICE
Associate
Bristol, UK
Search for other works by this author on:
(corresponding author)
Publisher: Emerald Publishing
Received:
April 16 2020
Accepted:
June 12 2020
Online ISSN: 1751-7672
Print ISSN: 0965-089X
ICE Publishing: All rights reserved
2020
Proceedings of the Institution of Civil Engineers - Civil Engineering (2020) 173 (6): 37–45.
Article history
Received:
April 16 2020
Accepted:
June 12 2020
Citation
Fletcher N, Brown M, Sadek T (2020), "Great Western railway electrification, UK: Patchway tunnels". Proceedings of the Institution of Civil Engineers - Civil Engineering, Vol. 173 No. 6 pp. 37–45, doi: https://doi.org/10.1680/jcien.20.00021
Download citation file:
New and popular articles
Suggested Reading
Implementation and challenges on the Doha Metro project, Qatar.
Proceedings of the Institution of Civil Engineers - Civil Engineering (July,2018)
Stresses and displacements in reinforced tracks
Proceedings of the Institution of Civil Engineers - Ground Improvement (February,2014)
Beams on extensible geosynthetics and stone-column-improved soil
Proceedings of the Institution of Civil Engineers - Ground Improvement (November,2013)
Channel Tunnel Rail Link section 1: ground engineering
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2003)
Channel Tunnel Rail Link section 2: north Thames marshes
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2007)
Related Chapters
Determination of Shear Strength Parameters of Tire Chips and Grains
5th ICEG Environmental Geotechnics: Opportunities, Challenges and Responsibilities for Environmental Geotechnics: Proceedings of the ISSMGE’s fifth international congress organized by the Geoenvironmental Research Centre, Cardiff University and held at Cardiff City Hall on 26–30th June 2006
Turning segmental tunnels into sources of renewable energy
ICE Themes Smart Concrete
Overview of machine learning in civil engineering
Machine Learning in Civil Engineering and Infrastructure Development: A Practitioner's Handbook
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
