The £5·2 billion Channel Tunnel Rail Link is the largest single civil engineering project currently under construction in the UK. Due for completion by end 2006, it will cut train journeys to Europe by 35 minutes and make it possible to get from London to Paris in just 140 minutes. On the first 74 km section, which is now 60% complete, all setting out and as-built surveys are being undertaken by way of an innovative shared network of state-of the-art global positioning system (GPS) base stations. Using compatible GPS rover units, contractors are able to transfer project design information directly to the field to an accuracy of ±25 mm horizontally and ±20 mm vertically. This paper describes the thinking behind the approach, how it has worked in practice and in particular how it has helped to foster a partnering environment.
Article navigation
May 2001
Research Article|
May 01 2001
Setting out the Channel Tunnel Rail Link
C. Kelly
C. Kelly
Data manager for Rail Link Engineering
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1751-7672
Print ISSN: 0965-089X
© 2001 Thomas Telford Ltd
2001
Proceedings of the Institution of Civil Engineers - Civil Engineering (2001) 144 (2): 73–77.
Citation
Kelly C (2001), "Setting out the Channel Tunnel Rail Link". Proceedings of the Institution of Civil Engineers - Civil Engineering, Vol. 144 No. 2 pp. 73–77, doi: https://doi.org/10.1680/cien.2001.144.2.73
Download citation file:
283
Views
New and popular articles
Suggested Reading
Benefits of an Edinburgh—Newcastle high-speed rail link
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (June,2006)
CrossRail: Introduction
Proceedings of the Institution of Civil Engineers - Transport (May,2001)
Metrolink—building on success
Proceedings of the Institution of Civil Engineers - Transport (August,2001)
An approach to mark-ups through capacity charges
Proceedings of the Institution of Civil Engineers - Transport (April,2014)
CrossRail: Scope, background and feasibility
Proceedings of the Institution of Civil Engineers - Transport (May,2001)
Related Chapters
The Integration of the Connection Between Land Use and Traffic Surrounding Rail Transit Stations: The Case of Nanjing
Sustainable Transport for Chinese Cities
Planning for Disruptive Transport Technologies: How Prepared Are Australian Transport Agencies?
Governance of the Smart Mobility Transition
Integrated Urban Transport Planning in the Era of Autonomous Vehicles
Sustainable Automated and Connected Transport
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.