Skip to Main Content
Article navigation

This paper shows that the ICE's NEC Engineering and Construction Contract really is a well-structured and flexible tool that can deliver rather than dictate procurement strategy. It describes how Yorkshire Water Services simply and neatly modified the contract to allow new parcels of work on a rolling reservoir-upgrading programme—from feasibility studies to construction at different sites—to be let on a reimbursable, a lump-sum or a target-cost basis within a single contract. It explains the simple innovations with the ECC conditions and the structure of the contractor–consultant teams commissioned to undertake the work. A review of the possible wide-ranging applications of the modified contract is then given.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal