Article navigation

British prime minister Tony Blair opened the first 74 km section of the new £5·2 billion high-speed rail link between the Channel Tunnel and London in September 2003. It has cut 20 minutes from the Eurostar service to Europe and brings Paris to just over 2·5 hours from London. This paper provides an overview of the design and construction of the first section, which has set new records for infrastructure as well as a wide range of new operational, safety and environmental standards for future high-speed rail projects in the UK.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close subscription notice
Close access options