Removing, dismantling and recycling the world's largest steel gravity platform has proved that the energy industry can safely and sustainably decommission its vast offshore infrastructure when the oil runs out. Nearly 100% of the 110 000 t Maureen platform and its associated 9000 t loading column was either re-used or recycled—with major structural components being used to build new port facilities and 42 000 t of steel landed ashore for scrapping. This paper reports on the complex and delicate task of cleaning and progressively dismantling the vast structure in a Norwegian fjord. It was the final phase of a £150 million decommissioning project, which has now set a benchmark for over 200 other steel structures currently operating in the British sector of the North Sea.
Article navigation
May 2004
Research Article|
May 01 2004
Dismantling the Maureen platform—an overview
Peter Broughton;
Peter Broughton
The Maureen refloat and decommissioning project manager for ConocoPhillips and is now a consultant to Peter Frankel Maritime and visiting professor at Oxford University
Search for other works by this author on:
Richard Davies;
Richard Davies
The Maureen refloat and decommissioning project structural engineer for ConocoPhillips and is now a structural engineer for ConocoPhillips
Search for other works by this author on:
Mike Green
Mike Green
Project manager with Saipern UK Limited and formerly the site project engineer for ConocoPhillips
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1751-7672
Print ISSN: 0965-089X
© 2004 Thomas Telford Ltd
2004
Proceedings of the Institution of Civil Engineers - Civil Engineering (2004) 157 (2): 79–85.
Citation
Broughton P, Davies R, Green M (2004), "Dismantling the Maureen platform—an overview". Proceedings of the Institution of Civil Engineers - Civil Engineering, Vol. 157 No. 2 pp. 79–85, doi: https://doi.org/10.1680/cien.2004.157.2.79
Download citation file:
439
Views
New and popular articles
Suggested Reading
Deconstruction of the Maureen platform and loading column
Maritime Engineering (March,2004)
Reusability analytics tool for end-of-life assessment of building materials in a circular economy
World Journal of Science, Technology and Sustainable Development (October,2018)
The need for listed building consent
Property Management (March,1993)
Safety and health education for demolition and reconstruction
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (August,2011)
A best practice policy for recycling and reuse in building
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (September,2008)
Related Chapters
A large scale demolition in a densely populated urban area – a case study
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
REMOVAL OF GYPSUM PLASTER BY THE USE OF MICROWAVES
Challenges of Concrete Construction: Volume 5, Sustainable Concrete Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
Location is Crucial in Retrofit: Strategy Selection in Different Regions
10th Nordic Conference on Construction Economics and Organization
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.