This paper describes the innovative and complex process of planning and designing a major programme of temporary venues for the London 2012 Olympic and Paralympic Games. It sets out the unique challenges of designing high-quality temporary venues and at the same time meeting sustainability, technical and cost parameters. The paper explains the early decision-making process and key drivers that influenced the overall approach to deciding whether venues would be permanent, temporary or a mix of both. It also discusses some of the issues related to temporary as opposed to reusable, demountable or relocatable. The Basketball Arena is used as a case study to demonstrate how an innovative approach has delivered significant cost and programme benefits and to share the key lessons learned.
Article navigation
November 2011
Research Article|
November 01 2011
Delivering London 2012: temporary venues
Alison Nimmo, CBE, BA, BPI, FRICS, MRTPI;
Alison Nimmo, CBE, BA, BPI, FRICS, MRTPI
1
is director of design and regeneration at the Olympic Delivery Authority
Search for other works by this author on:
Simon Wright, BSc, CEng, FICE, MAPM;
Simon Wright, BSc, CEng, FICE, MAPM
2
is director of infrastructure and utilities at the Olympic Delivery Authority
Search for other works by this author on:
David Coulson, ACIOB
David Coulson, ACIOB
3
is head of temporary venues at CLM
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1751-7672
Print ISSN: 0965-089X
ICE Publishing: All rights reserved
2011
Proceedings of the Institution of Civil Engineers - Civil Engineering (2011) 164 (6): 59–64.
Citation
Nimmo A, Wright S, Coulson D (2011), "Delivering London 2012: temporary venues". Proceedings of the Institution of Civil Engineers - Civil Engineering, Vol. 164 No. 6 pp. 59–64, doi: https://doi.org/10.1680/cien.2011.164.6.59
Download citation file:
New and popular articles
Suggested Reading
Queensferry Crossing, UK: towers, piers and abutments – design and construction
Proceedings of the Institution of Civil Engineers - Bridge Engineering (July,2018)
Delivering London 2012: power lines undergrounding
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2011)
London 2012 legacy: transformation of the Olympic Park
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2014)
Delivering London 2012: utilities
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2011)
London 2012 legacy: E20 – creating an integrated piece of city
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2014)
Related Chapters
The 2010 Olympic and Paralympic Winter Games
Contemporary Destination Governance: A Case Study Approach
Reflections on an Attempt to Do “Environmental Sports Journalism”: The Behind-the-Scenes Story of the Documentary Mount Gariwang: An Olympic Casualty
Sport and the Environment: Politics and Preferred Futures
Protest at the Olympic Games: How Political Movements Scythe Space for Athlete-Activist Moments
Athletic Activism: Global Perspectives on Social Transformation
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
