The Cheung Chau submarine pipeline between Hong Kong’s Lantau and Cheung Chau islands is a 1·4 km long, 500 mm diameter water main installed by horizontal directional drilling. It is one of the largest trenchless pipeline projects undertaken in Hong Kong. Drilling through a variety of rock strata up to 100 m below sea level was inherently risky, so use of an appropriate procurement strategy was pivotal to controlling costs and ensuring successful delivery. The government’s Water Supplies Department opted to adopt the Institution of Civil Engineers’ NEC3 Engineering and Construction Contract for the project. This paper describes the scope of the work, how an appropriate contract strategy was chosen and how NEC3 facilitated effective risk management during construction. It concludes with a recommendation that NEC3 brings valuable benefits and is suitable for use in future similar projects.
Article navigation
1 February 2017
Research Article|
June 17 2016
Delivering the Cheung Chau submarine pipeline in Hong Kong using NEC3
Dennis Li, BEng, LLB, MHKIE;
Dennis Li, BEng, LLB, MHKIE
Accredited NEC3 ECC Project Manager, Senior Engineer
Black and Veatch, Hong Kong
Search for other works by this author on:
Warren Lo, MHKIE;
Warren Lo, MHKIE
Engineer
Water Supplies Department, Hong Kong
Search for other works by this author on:
Stephanus Shou, BASc, FHKIE
Stephanus Shou, BASc, FHKIE
Director
Black and Veatch, Hong Kong
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
August 12 2015
Accepted:
March 09 2016
Online ISSN: 1751-7672
Print ISSN: 0965-089X
ICE Publishing: All rights reserved
2017
Proceedings of the Institution of Civil Engineers - Civil Engineering (2017) 170 (1): 27–32.
Article history
Received:
August 12 2015
Accepted:
March 09 2016
Citation
Li D, Lo W, Shou S (2017), "Delivering the Cheung Chau submarine pipeline in Hong Kong using NEC3". Proceedings of the Institution of Civil Engineers - Civil Engineering, Vol. 170 No. 1 pp. 27–32, doi: https://doi.org/10.1680/jcien.15.00047
Download citation file:
New and popular articles
Suggested Reading
Reduction of pier scour using bed suction and jet injection
Proceedings of the Institution of Civil Engineers - Water Management (February,2014)
Development and application of large-scale model test system for underwater shield tunnels
Proceedings of the Institution of Civil Engineers - Structures and Buildings (December,2019)
An unusual marine outfall off central California, USA
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (September,2001)
11 000 t deck superlift for RBS-8M drilling semi-submersible
Proceedings of the Institution of Civil Engineers - Structures and Buildings (May,2001)
High-resolution sonars set to revolutionise bridge scour inspections
Proceedings of the Institution of Civil Engineers - Civil Engineering (February,2015)
Related Chapters
Channels and harbour basins
Port Designer's Handbook
Berthing requirements
Port Designer's Handbook
Impact from ships
Port Designer's Handbook
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.