Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: CAGES
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
STOREBAELT EASTERN RAILWAY TUNNEL: CONSTRUCTION.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Civil Engineering (1996) 114 (5): 20–39.
Published: 01 May 1996
... LININGS EPOXY COVERED COATED REINFORCEMENT CAGES PROJECTS MANAGEMENT CONTRACTS BORED JOINT VENTURES BEHAVIOUR ALIGNMENT SURVEYS MUCK DISPOSAL SEABED WATER CON STOREBAELT EASTERN DENMARK SCANDINAVIA ...
Journal Articles
TUNNELS - THE PRECASTING PLANT.
Available to PurchaseH BARTHES, A BORDAS, D BOUILLOT, M BUZON, P DUMONT, J FERMIN, J C LANDRY, J P LARIVE, L LEBLOND, J J MORLOT, L SZYPURA, P VANDEBROUCK, B VIELLIARD
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (5): 52–57.
Published: 01 May 1994
... consumption rose taon averageof 8000 kW/h per month during theperiod of full production (1989-90). It peaked a t 13000 kW/h in the cold of January 1991 and fell to a minimum of 5500 kW/h in July 1990. Reinforcement shop 9. To ensure quality and an even rate of production, reinforcement cages were fabricated...
Journal Articles
TUNNEL LINING DESIGN AND PROCUREMENT.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Civil Engineering (1992) 92 (5): 127–143.
Published: 01 December 1992
... ASSURANCE LOADS LIMIT STATE FABRICATION REINFORCEMENT CAGES PRODUCTION RINGS CONTRACTS DURABILITY CHANNEL TUNNEL ENGLISH CHANNEL CHANNEL ISLE OF GRAIN UK FRANCE EUROPE Tunnelilningdesignandprocurement R. c. W.Eves, BSc(Eng),MICE and D. J. Curtis,BSc(Eng), MSc(Eng)D, IG, FICE...
