Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-20 of 26
Keywords: CLAYS
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (6): 26–35.
Published: 01 November 1999
... by a blanketof Pleistocenegravel and sand which is cappedby recent alluvium and made mmd Fur-3)- The youngest of the Tertiary sediments is the LondonClay, which occupiesthe peripheryof ~e dome outcropping at the east and west ends of the route. Thisis a stiff to very stiff,fissured, silty clay, which has been...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (6): 47–55.
Published: 01 November 1999
... aquiferis confined below the clays of the Woolwich and Readmg Beds, in the Thanet Sands and chalk.The impounded dock water level is at +l04m project datum (PD) (+4 mAOD), while the lower aquiferhad a pieza metric headof +97mPD. Design The design of the station was awarded to Posford Duvivierand Sir Norman...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (6): 36–46.
Published: 01 November 1999
... ALIGNMENT INTERCHANGES TICKET HALLS SETTLEMENT ESCALATORS PLATFORMS TUNNELS TENDERS ARCHITECTS CONTRACTORS JOINT VENTURES GEOTECHNICS PILES CLAYS LONDON CLAY WOOLWICH BEDS READING BEDS SAND THANET SAND CHALK EARTH PRESSURE SOILS STRUTS SLABS DEMOLITION UNDERPINNING GROUND...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (2_3): 103–117.
Published: 01 May 1999
... complexity was minimized by commencing line operation on short completed sections of the new phase in advance of its total length. Geology Line 2 soil profile consists of man-made fill, silty clay/clayey silt, interbedded clay silt, and sand and alluvial sands. The soil profile under the main branch...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (1): 2–13.
Published: 01 February 1999
... provides the interest of a constantly changing form for observers passing through it. Geology Starting at ground level at the top of the existing cutting slopes, the site is typically underlain with 3 4 m of made ground then 9 11 m of boulder clay over the Bunter Sandstone. In most of the boreholes...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1997) 120 (3): 90–100.
Published: 01 August 1997
...H NAKADA; K AKIMOTO; H KANAZAWA; Y TSUJI; M INADA © Thomas Telford and ICE 1997 JAPAN MINISTRY OF TRANSPORT PORT CONSTRUCTION BUREAU AIRPORTS OFFSHORE EXPANSION PROJECTS SLUDGE FILL LAGOONS CONSTRUCTION CAPACITY NOISE TERMINALS LINK RUNWAYS SITES CLAYS WET DREDGED...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1997) 120 (5): 43–53.
Published: 01 May 1997
... TRANSIENTS CLAYS LAYERS ABUTMENTS TRANSFER TUNNELS PLANT GEOLOGY BASALT UPSTREAM SURGES SHAFTS SITES ARCHES FINITE ELEMENTS ANALYSIS PROGRAMS DRAINAGE GROUTING CONTRACTS MUELA HIGHLANDS LESOTHO SOUTH AFRICA AFRICA MUELA HYDROPOWER STATION Lesotho Highlands water project...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1996) 114 (4): 150–160.
Published: 01 November 1996
... in 1995, the 1·8 km long, 8·4 m dia. tunnel has been built to accommodate double-stack container trains and replaces an existing century-old tunnel link. The concretelined tunnel was driven by one of the largest ever full-face earth pressure balance machines through soft squeezing clay with shallow cover...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1996) 114 (3): 130–139.
Published: 01 August 1996
... RAILWAYS CABLES TRACTION HISTORY PLANNING DESIGN CONSTRUCTION ENGINEERS CONTRACTORS TUNNELLING TUNNELS HAULAGE CUT AND COVER TIMBER SHEETPILES SHEETPILING PILES ARCHES CONCRETE EXCAVATION ALLUVIAL MATERIALS SHIELDS CLAYS ROCKS STATIONS GLASGOW SCOTLAND UK Proc...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1995) 108 (3): 135–136.
Published: 01 August 1995
...R J CHANDLER; M S CRILLY; MONTGOMERY SMITH; M G SMITH; T S RICKEARD © Thomas Telford and ICE 1995 SOIL CONSULTANTS LTD LOW COST METHODS ASSESSMENT CLAYS DESICCATION LOW RISE BUILDINGS SOILS CLAYS GROUND CASE STUDIES FILTER PAPER COSTS LOW DISCUSSION h e . Inch Ciu Emg...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1995) 108 (2): 88–89.
Published: 01 May 1995
...A M MUIR WOOD; A M M WOOD; R C JENKINS; I K BRUNEL © Thomas Telford and ICE 1995 TUNNELS THAMES TUNNEL SHIELDS TUNNELLING RIVERS UNDERWATER SUBMARINE HISTORY BRICKWORK BRICKS CLAYS LONDON CLAY THAMES TUNNEL LONDON ROTHERHITHE WAPPING UK DISCUSSION m.Inshl...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (3): 130–139.
Published: 01 August 1994
...A M MUIR WOOD; A M M WOOD; M I BRUNEL © Thomas Telford and ICE 1994 SIR WILLIAM HALCROW TUNNELS THAMES TUNNEL SHIELDS TUNNELLING RIVERS UNDERWATER PROJECTS HISTORY SHAFTS CLAYS LONDON CLAY SUBMARINE METHODS THAMES TUNNEL LONDON ROTHERHITHE WAPPING UK...
Journal Articles
H BARTHES, A BORDAS, D BOUILLOT, M BUZON, P DUMONT, J FERMIN, J C LANDRY, J P LARIVE, L LEBLOND, J J MORLOT, L SZYPURA, P VANDEBROUCK, B VIELLIARD
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (5): 6–10.
Published: 01 May 1994
... m from the theoretical position of old Geotechnical characteristics uncharted boreholes, which does not invade the 10. These influenced the design of all the Gault Clay. The protection afforded by a desir- tunnel works, i.e. the tunnel proper, in particu- able 5m clearance could not be maintained...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (1): 8–14.
Published: 01 February 1994
... FOUNDATIONS PILES GRAVEL CLAYS LONDON CLAY SUPERSTRUCTURES FRAMES ROOFS CLADDING HEATING VENTILATION COOLING ELECTRICITY PROTECTION FIRES STAIRWAYS LONDON ARK LONDON HAMMERSMITH LILLA HUSET UK SWEDEN © Thomas Telford and ICE 1994 Proc. Instn Civ. Engrs Civ. Engng, 102...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (6): 14–22.
Published: 01 January 1994
... London Clay. The wedgeblock segment lining purpose and constructionmethodology dictated Engineer, system hascommonly been used under the the scale of both permanent and temporary ' Ealfour Marnsell Ltd latter conditions, butbolted and concrete-lined land-take at any surface installation. 14...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (6): 60–75.
Published: 01 January 1994
...R P J CLARKE; C N P MACKENZIE; TELFORD UK THAMES LONDON TOOTING BEC STREATHAM BRIXTON RADBOURNE ROAD WATER RINGS MAINS RING CONSTRUCTION TUNNELS GROUND PROBLEMS TUNNELLING MACHINERY SILT INUNDATION SOLUTIONS COMPLETION PLANNING DELAYS SHIELDS CLAYS LONDON CLAY...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (6): 23–33.
Published: 01 January 1994
..., and shortest practicable alignmentbetween shafts, connections into various existing trunk mains with the aimof constructing the tunnel within and service reservoirs. Therewere the normal London Clay wherever possible.The route constraints: the total budget was limited to avoided tall.buildings(more than five...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (6): 43–59.
Published: 01 January 1994
... expected to lie within thLeondon Clay. To the eastof Streatham shaft 1.8km of the alignmentmoved into Woolwich and Reading Beds and passed through the Thanet Sands at the Wimbledon fault. The alignment returned toLondon Claynorth of Brixton, and M. Dick, Principal Construction kngineer, Tkumes Water Ring...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1993) 97 (2): 67–76.
Published: 01 May 1993
... minimized as faras possible by On one occasiona sudden loss of bentoniteworkingsequentially. occurred due tolocal collapse of the ground beneath the guide walls. Theexcavationwas Piling immediately filled with blue clay, but thidsid The majority of the piles were 2.4 m in diam- not provesufficiently stable...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1993) 97 (1): 19–26.
Published: 01 February 1993
...S P MARCHAND © Thomas Telford and ICE 1993 COSTAIN CONSTRUCTION BASEMENTS DEEP CONTRACTORS DESIGN PLANNING CONSTRUCTION TOP DOWN METHODS PROGRESSIVE SLABS EXCAVATIONS SUPERSTRUCTURES ERECTION MULTI LEVEL CAR PARKS UNDERGROUND DIAPHRAGM WALLS CLAYS LONDON CLAY PINS...