Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: COMPRESSED
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
STOREBAELT EASTERN RAILWAY TUNNEL. DISCUSSION OF PAPERS 11006, 11026,10961,11027 & 10999.
Available to PurchaseH H GOTFREDSEN, K H OSTENFELD, I H ELLIOT, A S ODGARD, D J CURTIS, A R BIGGART, R STERNATH, J C TAIT, N P HOJ, K ABILDGREN, K KEILER, M FREDERIKSEN, N HARRISON, G INCE, R N CRAIG, C D WARREN, BALLARD
Proceedings of the Institution of Civil Engineers - Civil Engineering (1997) 120 (4): 183–185.
Published: 01 November 1997
.... A cutterhead with gates which could be closed off would have provided greater safety for personnel entering the excavation chamber under compressed air for cuttertool changing. This would also have avoided the very expensive ground treatment needed to stabilize the face for safe man entry into the excavation...
Journal Articles
THE UK - CONTINENT GAS INERCONNECTOR.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Civil Engineering (1997) 120 (2): 66–73.
Published: 01 May 1997
...C J MARCHANT © Thomas Telford and ICE 1997 INTERCONNECTOR UK TRANSCO DISTRIGAZ GAS INTERCONNECTORS TRANSMISSION SYSTEMS NATURAL COMPRESSED SUBSEA PIPELINES PIPES UNDERWATER SUBMARINE GRIDS POWER ENERGY EXPORTS PRODUCTION PLANNING DESIGN CONSTRUCTION METHODS...
Journal Articles
COLLECTION SYSTEM: TUNNELS.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Civil Engineering (1993) 97 (5): 18–33.
Published: 01 May 1993
... STATIONS CONSTRUCTION CONTRACTS METHODS CONTRACTORS SHAFTS SINKING TUNNELLING CAISSONS SLURRY SHIELDS JOINT VENTURES CONSORTIA GROUND TREATMENT COMPRESSED AIR CONSOLIDATION BENTONITE MACHINERY BRICKS BRICKWORK SETTLEMENT CITIES COUNTRIES DEVELOPING SEWERS WATER CAIRO...
