Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-20 of 73
Keywords: CONTRACTS
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (2007) 160 (5): 36–42.
Published: 01 May 2007
... to accept 7–8 p/day. contracts history roads & highways Much has been written about the major bridges—such as Dunkeld and Craigellachie, built by Telford in the Highlands of Scotland in the early part of the nineteenth century—because they were major engineering achievements at the time...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (2002) 150 (6): 10–16.
Published: 01 November 2002
... of potentially serious legal implications—such as validity of contract notices, ownership of data and intellectual property rights. This paper reports on findings from eLEGAL, an EU-funded research project to enable the legally admissible use of information and communication technology in construction projects...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (2002) 150 (6): 51–55.
Published: 01 November 2002
... m2 per floor based upon 7·5 m × 7·5 m structural grids and pad foundations. The contract documents include the drawings, the specification and bill of quantities. The problem was to assemble a virtual community of agents capable of delivering the various work packages involved in the project...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (2001) 144 (2): 78–83.
Published: 01 May 2001
...R. L. Patterson This paper shows that the ICE's NEC Engineering and Construction Contract really is a well-structured and flexible tool that can deliver rather than dictate procurement strategy. It describes how Yorkshire Water Services simply and neatly modified the contract to allow new...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (2000) 138 (2): 73–78.
Published: 01 May 2000
...Martin Barnes, PhD, BSc, CIMgt, FCIOB, FICE, FREng Civil engineering management in the next century will be dramatically different from the last, thanks to a growing and long-overdue realization that the traditional forms of contract—virtually unchanged since the 1860s—have had their day.This paper...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (6): 26–35.
Published: 01 November 1999
... machines. This paper describes the general specification for the precast concrete, cast iron and sprayed tunnel linings and then highlights some of the many innovations which both designers and contractors introduced on each of the six main tunnelling contracts. JUBILEE LINE EXTENSION PROJECT...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (6): 47–55.
Published: 01 November 1999
... these areas be cut out when the Citibank building is completed. Advanced works contract It was decidedto group several advancedworks elementsinto a separate d m package,whichwas awardedto LG Mouchel & Partners.The elements included in the advanceworks cmtmct (FE.7)were l,cdoLfEfeeradsamt DRAKE, JACKSON...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (6): 11–18.
Published: 01 November 1999
... of the engineer under the contracts. He also took overall responsibililyfor haljzingthe designs and for obtamng all approvalsneeded to allow construction to start The separate safe@and quality departments were merged into one in 1992. Management controlwas provided through a project executive group, chaired...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (2_3): 103–117.
Published: 01 May 1999
... construction for the first phase of Line 2 was a joint venture of French and local contractors led by Campenon Bernard (SGE) France. However, a separate local contract was provided for the civil works for the at-grade and elevated sections in the first phase. The project consultant selected by the client...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (2_3): 125–131.
Published: 01 May 1999
...S LEWIS; LATHAM UK The Housing Grants, Construction and Regeneration Act 1996 S. Lewis, LLM, LLB, ACIArb All UK civil engineering contracts entered into after 1 May 1998 are now governed by Part II of the Housing Grants, Construction and Regeneration Act 1996 the so-called Construction Act...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (4): 163–170.
Published: 01 November 1998
...D C BROWN; M J RILEY © Thomas Telford and ICE 1998 SOUTHAMPTON UNIVERSITY WESTMINSTER DREDGING BEACHES SHINGLE STABILISATION PARTNERING CASE STUDIES SPITS CONTRACTS DELAYS PROJECTS IMPROVEMENT CONSTRUCTION CONTRACTORS CLIENTS ENGINEERS PRODUCTIVITY HURST...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (6): 35–54.
Published: 01 November 1998
... RAILWAYS CONSTRUCTION PURPOSE BUILT TUNNELS TRACK STATIONS CONTRACTS PROJECTS MANAGEMENT SAFETY SUBWAYS IMMERSED TUBES SIGNALS ROLLING STOCK TRAINS PASSENGERS COSTS CONTROL QUALITY ASSURANCE CONSULTANTS CONTRACTORS HONG KONG MASS TRANSIT RAILWAY CORPORATION MTRC HONG KONG...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (6): 55–69.
Published: 01 November 1998
... PRIVATE PRIVATE SECTOR PROJECTS CONTRACTS MANAGEMENT ORGANISATION CUT AND COVER TOP DOWN CONSTRUCTION WALLS DIAPHRAGM TRANSPORT INFRASTRUCTURE OVE ARUP WESTERN HARBOUR CROSSING HONG KONG CHEK LAP KOK SAI YING PUN WEST KOWLOON HONG KONG CHINA ASIA Western Harbour...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (4): 186–187.
Published: 01 November 1998
...G WOODALL; ICES © Thomas Telford and ICE 1998 INSTITUTION OF CIVIL ENGINEERING SURVEYORS ICES PARTNERING COMPETITION COSTS REDUCTION TENDERS COMPETITIVE TENDERING CONTRACTS BRIEFING apply. Sometimes this has been expanded with vision to VIRDA. But the world has moved...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (2): 86–95.
Published: 01 May 1998
...D G MCBETH; F HENNEBIQUE; L G MOUCHEL © Thomas Telford and ICE 1998 WSP CONSULTING CONCRETE REINFORCED HISTORY BIOGRAPHY BETON SYSTEMS BETON ARME STRUCTURES BUILDINGS THEORY CONTRACTORS RESTORATION CHURCHES RAILWAYS BRIDGES VIADUCTS STEEL SLABS ROADS CONTRACTS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (5): 15–34.
Published: 01 May 1998
... SITES SELECTION LAYOUT PREDICTION SETTLEMENT ENVIRONMENT PLANNING PLANS CONTRACTS PERFORMANCE ISLANDS ARTIFICIAL PLATFORMS ASPHALT CONCRETE BLOCKS HONG KONG AIRPORT AUTHORITY HONG KONG CHEK LAP KOK HONG KONG CHINA ASIA Hong Kong International Airportcivil...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (2): 73–85.
Published: 01 May 1998
... PLANNING SITE INVESTIGATION RADAR SCANNING STRUCTURAL REFURBISHMENT CASE STUDIES HERITAGE CIVIL ENGINEERING HISTORIC HISTORY STRUCTURES SPANS ARCHES VOUSSOIRS STONE FREESTONE MASONRY TENDERS CONTRACTS LAIGH MILTON AYRSHIRE SCOTLAND KILMARNOCK TROON UK Conservation...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (5): 5–14.
Published: 01 May 1998
.... It discusses the formidable problems and constraints which faced the 35 000 construction workers and explains the complex management and control structures which enabled this huge project to be completed on time and within budget. Tendering procedures, conditions of contract and dispute resolution mechanisms...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (5): 35–54.
Published: 01 May 1998
...A I THOMSON; D E OAKERVEE The new Hong Kong International Airport was built on a remote island site at Chek Lap Kok in just seven and a half years. This paper describes how construction progressed from the initial advance works contract awarded in January 1991 to the opening of the completed, state...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (1): 12–18.
Published: 01 February 1998
... launched its private finance initiative (PFI) in 1992 to improve procurement of public sector projects. But the complexities of putting design, build, finance and operate contracts out to tender have meant that very few PFI schemes have actually got off the ground. Indeed, the initiative has been described...
