Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (6): 26–35.
Published: 01 November 1999
...H R DAVIES The Jubilee Line Extension took the London Underground network for the first time into the difficult waterlogged sands and gravels in the south east of the capital. However, there were very few problems with the now tried-and-tested technology of earth pressure balance tunnelling...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (4): 181–187.
Published: 01 November 1999
...H B SUTHERLAND; W J M RANKINE; SMEATON © Thomas Telford and ICE 1999 GLASGOW UNIVERSITY BIOGRAPHY ENGINEERS EARTH PRESSURE GEOTECHNICS THERMODYNAMICS SHIPS DESIGN ENGINEERING EDUCATION COURSES DEGREES SCIENCE SOCIETY HISTORY Professor William John Macquorn Rankine H...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (6): 36–46.
Published: 01 November 1999
... ALIGNMENT INTERCHANGES TICKET HALLS SETTLEMENT ESCALATORS PLATFORMS TUNNELS TENDERS ARCHITECTS CONTRACTORS JOINT VENTURES GEOTECHNICS PILES CLAYS LONDON CLAY WOOLWICH BEDS READING BEDS SAND THANET SAND CHALK EARTH PRESSURE SOILS STRUTS SLABS DEMOLITION UNDERPINNING GROUND...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (3): 144.
Published: 01 August 1998
...C LANTWIN © Thomas Telford and ICE 1998 NEC EUROPEAN COMPUTER SYSTEMS COMPUTERS SUPERCOMPUTERS VIRTUAL EARTH SIMULATION SIMULATORS MODELS OBSERVATIONS EARTH BRIEFING Creating a virtual Earth A virtual Earth is being created using the world s fastest computer. Dr...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1998) 126 (3): 106–115.
Published: 01 August 1998
...R CAPES; P BRUCCIANI Proc. Instn Civ. Engrs, Civ. Engng, 1998, 126, Aug., 106 115 Paper 11556 Practical uses of Earth observation for civil engineering R. Capes and P. Brucciani Written discussion closes 15 November 1998 Keywords: land surveying, site investigation A new generation of very high...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1996) 114 (4): 150–160.
Published: 01 November 1996
... in 1995, the 1·8 km long, 8·4 m dia. tunnel has been built to accommodate double-stack container trains and replaces an existing century-old tunnel link. The concretelined tunnel was driven by one of the largest ever full-face earth pressure balance machines through soft squeezing clay with shallow cover...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1996) 114 (5): 20–39.
Published: 01 May 1996
.... In difficult ground conditions the temporary support of the face and the excavation method both derive from the type of TBM used. This tunnel could probably not have been constructed 20 years ago. With today's state-ofthe-art the choice was clearly between a slurry tunnelling machine or an earth pressure...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (6): 43–59.
Published: 01 January 1994
... the overburden pressure. 10. Where Woolwich and Reading Beds or Thanet Sands were expected, a composite lining system was specified. This consisteodf primary and in situ secondary linings. The primary precast concretebolted segmental lining was designed to carry the full earth overburden pressures. After...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (6): 60–75.
Published: 01 January 1994
... DEWATERING THANET SAND SAND THANET STABILISATION EPBM EARTH PRESSURE BALANCE MACHINES SLURRY SELECTION SPECIFICATIONS LININGS PRECAST SEGMENTS SEGMENTAL CONTRACTS FIFTH EDITION SITES SHAFTS CITIES SUPPLY WATER SUPPLY AMEC THAMES WATER UTILITIES © Thomas Telford and ICE...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1993) 97 (6): 32–41.
Published: 01 January 1993
...M GLADSTONE; J G GRANT; A J POWDERHAM; D K YOUNG CHANNEL TUNNEL TUNNELS TERMINALS CIVIL ENGINEERING WORKS DESIGN TRACKWORK STRUCTURES ARRIVALS LOOPS A20 M20 ROADS RAILWAYS BRIDGES PLATFORMS OVERBRIDGES RAMPS REINFORCED EARTH WALLS BRICKPITS DESIGN AND BUILD PROJECTS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1993) 97 (6): 42–50.
Published: 01 January 1993
... stone with particularemphasis on earth- which stipulated blanketing withrelatively works, majorstructures, scheduling with impermeable material before bulk fill contain. reporting andconstruction safety. ing contaminantscould take place. The initial requirement for 6 m of protection was ultima- tely...