Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-9 of 9
Keywords: ERECTION
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (2_3): 132–143.
Published: 01 May 1999
...M J RYALL; R STEPHENSON; HODGKINSON; FAIRBAIRN; CLARK © Thomas Telford and ICE 1999 SURREY UNIVERSITY BRIDGES CONSTRUCTION RAILWAYS ANALYSIS DESIGN PROJECTS PIERS SPANS CAST IRON BEAMS THEORY EXPERIMENTS ERECTION TUBES PONTOONS METHODS STRUCTURES LOADS TOWERS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (1): 31–39.
Published: 01 February 1999
... of Flintshire, north Wales, UK. With its 120 m tall tower and slim deck spanning approximately 200 m, the asymmetric cable-stayed bridge provides access across the River Dee and is a striking local landmark. The erection of the bridge by the cantilever method required careful control of geometry and stresses...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1997) 120 (6): 49–63.
Published: 01 January 1997
... PREFABRICATED ERECTION BALANCED CANTILEVER METHODS PYLONS TWIN LEG LEGS TWIN PRESTRESSED VIBRATIONS SECONDARY PORTAL FRAMES BACKSPANS AERODYNAMICS MODELS TESTS TESTING FORCES GEOMETRY SEVERN SECOND ENGLAND WALES SHOOTS UK CABLE-STAYED BRIDGE Second Severn crossing cable...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1997) 120 (6): 35–48.
Published: 01 January 1997
... CASTING ON SITE ERECTION BALANCED CANTILEVER LAUNCHING GANTRIES CONCRETE ELASTOMERIC BEARINGS MOVEMENT JOINTS FINISHES FURNITURE WORKS MECHANICAL ELECTRICAL MONORAIL SERVICE TOLLS PLAZA DURABILITY MANUFACTURE STRESSING ENDS SEVERN SECOND ENGLAND WALES SHOOTS UK...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1993) 97 (3): 127–134.
Published: 01 August 1993
... established a series of construction stagesat which the extentof demolition andof construction were uniquely defined itnerms of surcharge loading. Thesuperstructure being erected was far from conventional: stanchions were erected with beamhaunches for each floor level already attached, concrete spandrel...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1993) 97 (2): 67–76.
Published: 01 May 1993
... and excavation takipnlgace concurrently with superstructure erection. 7m his Paper describesthe construction of a , multi-level underground car park within a diaphragm wall in London Clabyy the top down technique. The techniques used for diaphragm wall and pile construction under bentonite from existing ground...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1993) 97 (1): 19–26.
Published: 01 February 1993
...S P MARCHAND © Thomas Telford and ICE 1993 COSTAIN CONSTRUCTION BASEMENTS DEEP CONTRACTORS DESIGN PLANNING CONSTRUCTION TOP DOWN METHODS PROGRESSIVE SLABS EXCAVATIONS SUPERSTRUCTURES ERECTION MULTI LEVEL CAR PARKS UNDERGROUND DIAPHRAGM WALLS CLAYS LONDON CLAY PINS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1992) 92 (5): 55–86.
Published: 01 December 1992
... that an expanded of activity at ShakespeareCliff, the programme lining would be suitable and the programme was arranged to require only five TBMs to indicated that the speedof erection offered by operate at any one time, the land service tunnelan expanded lining was the correcchtoice. being programmed to finish...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1992) 92 (4): 177–184.
Published: 01 November 1992
...N HEWSON © Thomas Telford and ICE 1992 ACER USE DRY JOINTS PRECAST SEGMENTS CONCRETE BRIDGES DECKS JOINTING SEGMENTAL DESIGN CONSTRUCTION TENDONS CASTING MATCH MATCH CAST EXTERNAL METHODS ERECTION SERVICEABILITY ULTIMATE MOMENTS SHEAR EXPRESSWAYS ROADS...
