Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: PERMANENT
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
TUNNELS - SHAFT AND MARSHALLING CHAMBERS.
Available to PurchaseH BARTHES, A BORDAS, D BOUILLOT, M BUZON, P DUMONT, J FERMIN, J C LANDRY, J P LARIVE, L LEBLOND, J J MORLOT, L SZYPURA, P VANDEBROUCK, B VIELLIARD
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (5): 34–38.
Published: 01 May 1994
.... intermediate working point; aftetrhese 6. The shaft and marshalling chambers works, it was usedto house the permanent were surrounded by a60 m deep cut-off wallof ventilation and pumping equipment. This bentonite cement excavated by jetting to the Paper describes the shaft anidts construc- level of impermeable...
Journal Articles
A DEEP BASEMENT IN ALDERSGATE STREET, LONDON. PART 1: CONTRACTOR'S DESIGN AND PLANNING.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Civil Engineering (1993) 97 (1): 19–26.
Published: 01 February 1993
... PILES TOES LOADS SUPPORTS INSTRUMENTATION MOVEMENT TEMPORARY PERMANENT WORKS A deep basement in Aldersgate Street, Proc. Instn civ.Engrs London. Part l:Contractor s design and Ciu. Engng,1993. 98,Feb., 19-26 planning S. P. Marchand, BA(Cuntub), MICE, MIStructE With available land severely...
