Skip to Main Content
Keywords: PERMANENT
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (5): 34–38.
Published: 01 May 1994
.... intermediate working point; aftetrhese 6. The shaft and marshalling chambers works, it was usedto house the permanent were surrounded by a60 m deep cut-off wallof ventilation and pumping equipment. This bentonite cement excavated by jetting to the Paper describes the shaft anidts construc- level of impermeable...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1993) 97 (1): 19–26.
Published: 01 February 1993
... PILES TOES LOADS SUPPORTS INSTRUMENTATION MOVEMENT TEMPORARY PERMANENT WORKS A deep basement in Aldersgate Street, Proc. Instn civ.Engrs London. Part l:Contractor s design and Ciu. Engng,1993. 98,Feb., 19-26 planning S. P. Marchand, BA(Cuntub), MICE, MIStructE With available land severely...

or Create an Account

Close Modal
Close Modal