Keywords: SOFT
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1997) 120 (4): 165–176.
Published: 01 November 1997
...G S MILLINGTON RIVERS DEVELOPMENT CITIES URBAN REDEVELOPMENT INFRASTRUCTURE PLANNING DESIGN CONSTRUCTION WEIRS ROADS RAILWAYS BRIDGES CONCERTS CONFERENCES COMPLEXES REGENERATION FRONTAGES SILT SOFT ALLUVIAL SEDIMENTS FLOW WATER HARBOURS COSTS RIVER LAGAN BELFAST...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1996) 114 (4): 150–160.
Published: 01 November 1996
... in 1995, the 1·8 km long, 8·4 m dia. tunnel has been built to accommodate double-stack container trains and replaces an existing century-old tunnel link. The concretelined tunnel was driven by one of the largest ever full-face earth pressure balance machines through soft squeezing clay with shallow cover...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1994) 102 (6): 43–59.
Published: 01 January 1994
.... Construction of the tunnels wascarried out in two phases between August 1987 and February 1993 and involved the use oofpen-face shields and tunnel boring machines (TBMs).This Paper describes the development of soft ground tunnelling techniques during the two phases, including tunnel lining developments, tunnel...

or Create an Account

Close Modal
Close Modal