Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-8 of 8
Keywords: STAYS
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (1): 2–13.
Published: 01 February 1999
...N HUSSAIN; I WILSON © Thomas Telford and ICE 1999 OVE ARUP HULME REGENERATION HENRY BOOT BRIDGES ARCHES AWARDS CABLE STAYED ROADS DESIGN TECHNOLOGY SPANS CABLES STAYS SINGLE DIAGONAL PARABOLIC TAPERING TRAPEZOIDAL STEEL BOX SECTIONS COATINGS ALUMINIUM PAINT...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1999) 132 (1): 31–39.
Published: 01 February 1999
...H AL QARRA DEE CROSSING JOINT VENTURE NORWEST HOLST KIER CONSTRUCTION CAMPENON BERNARD SGE BRIDGES CONSTRUCTION CONTROL GEOMETRY RIVERS ESTUARIES ROADS LINK TOWERS DECKS ASYMMETRIC CABLE STAYED ERECTION CANTILEVER METHODS STRESS SUSPENSION STRUCTURES CABLES JOINT...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1997) 120 (6): 13–21.
Published: 01 January 1997
... at Halcrow-SEEE 13 KITCHENER AND MIZON Rail tunnel, cable stay removal, and so on. The nature of the estuary itself was one of the most significant factors in the choice of design and construction methods. The tidal range at the site is 14·5 m at spring tides, which is the second highest in the world...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1997) 120 (6): 22–34.
Published: 01 January 1997
... Crossing, 1997, 22-34 Paper 11441 This paper describes the design and construction of the foundations for the second motorway bridge over the Severn estuary between England and Wales. The two main piers of the central cable-stayed bridge and the 49 supports of the approach viaducts are founded mostly...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1997) 120 (6): 49–63.
Published: 01 January 1997
...D H MIZON; N SMITH; A J YEOWARD © Thomas Telford and ICE 1997 HALCROW SEEE LAING GTM BRIDGES CROSSINGS SECOND RIVERS CABLE STAYED CABLES STAYS ROADS MOTORWAYS M4 SPANS DESIGN CONSTRUCTION DECKS STEEL PLATES GIRDERS COMPOSITE REINFORCED CONCRETE SLABS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1996) 114 (2): 54–63.
Published: 01 May 1996
...H SVENSSON; E JORDET © Thomas Telford and ICE 1996 LEONHARDT ANDRA AAS JAKOBSEN VEIDEKKE BRIDGES CONCRETE CABLE STAYED FJORDS STRUCTURES WIND CLIMATE DESIGN GUSTS SLENDER SPANS CONSTRUCTION METHODS ANALYSIS AERODYNAMICS DAMPING NON LINEAR BEHAVIOUR ULTIMATE...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1995) 108 (3): 111–122.
Published: 01 August 1995
... to provide sufficient navigational headroom for sailing boats, the alignment of the deck is in averticalcurve. Four types of structure were studied as possible solutionsfor the bridging of Swiss Bay. A cantilever structure would havebeen muchtoo heavy Fig. 4) and asteel tied arch too dominant. In the stay...
Journal Articles
Proceedings of the Institution of Civil Engineers - Civil Engineering (1992) 92 (2): 57–65.
Published: 01 May 1992
... skilalnd care. The jacking of part of the load out of the towers, the replacement ofall of the hangers on the Severn Bridge and the changing of the stay support system for the Wye Bridge wereall unique operations. The boxgirders forming the decks were reinforced with new steelwork, most of which...
