Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: ULTIMATE
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
THE CONCRETE CABLE-STAYED HELGELAND BRIDGE IN NORWAY.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Civil Engineering (1996) 114 (2): 54–63.
Published: 01 May 1996
... and focuses on a new method of analysis that was used to account for aerodynamic damping and non-linear behaviour at ultimate load state. Following completion in 1991 after only 26 months on site, the bridge was instrumented for two years to confirm that it was behaving as predicted. Holger Svensson...
Journal Articles
THE USE OF DRY JOINTS BETWEEN PRECAST SEGMENTS FOR BRIDGE DECKS.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Civil Engineering (1992) 92 (4): 177–184.
Published: 01 November 1992
...N HEWSON © Thomas Telford and ICE 1992 ACER USE DRY JOINTS PRECAST SEGMENTS CONCRETE BRIDGES DECKS JOINTING SEGMENTAL DESIGN CONSTRUCTION TENDONS CASTING MATCH MATCH CAST EXTERNAL METHODS ERECTION SERVICEABILITY ULTIMATE MOMENTS SHEAR EXPRESSWAYS ROADS...
Journal Articles
LIMIT STATES AND PARTIAL FACTORS IN FOUNDATION DESIGN.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Civil Engineering (1992) 92 (4): 185–191.
Published: 01 November 1992
...W G K FLEMING © Thomas Telford and ICE 1992 QUEENS UNIVERSITY BELFAST CEMENTATION PILING & FOUNDATIONS LTD LIMIT STATE PARTIAL FACTORS FOUNDATIONS DESIGN METHODS ULTIMATE STATE GEOTECHNICS PILES STIFFNESS SETTLEMENT DEFORMATION LOADS SOILS CLAYS LONDON CLAY...
