Redundant reservoirs, whether they are subject to the provisions of reservoir legislation or not, have an ongoing maintenance requirement that places a burden on reservoir owners. Reservoirs upstream of communities also pose a risk to life. For these reasons, reservoir owners often consider discontinuing redundant assets; however, reservoirs can deliver amenity value for local communities as well as contributing to a desirable environmental habitat. Careful consideration should therefore be given to balancing the advantages and disadvantages when deciding whether to discontinue a reservoir. This paper will draw on case studies of five Scottish Water reservoir sites where the merits of discontinuance have been assessed. Two have been retained; and three have been discontinued. The key influences and lessons learned will be presented including identifying and mitigating environmental aspects; the findings from public consultations; the approach to whole life cost estimates; the benefits or otherwise of carrying ground investigations; the approach to dealing with sediment issues; the approach to managing flood risk during removal of the reservoir; and the approach to managing downstream flood risk following removal of the reservoir. The peculiarities of the Reservoirs (Scotland) Act 2011 will be touched on, as complete removal of a reservoir is termed abandonment!
Article navigation
March 2023
Research Article|
December 09 2022
Lessons learned from reservoir discontinuances
Ryan McHugh, MEng;
Ryan McHugh, MEng
Chartered Civil Engineer, Mott MacDonald, Glasgow, UK (corresponding author: ryan.mchugh@mottmac.com)
Search for other works by this author on:
Matthew Craig, MEng;
Matthew Craig, MEng
Civil Engineer, Mott MacDonald, Glasgow, UK
Search for other works by this author on:
Ross Morrin, BEng (Hons)
Ross Morrin, BEng (Hons)
Senior Reservoir Engineer and Supervising Engineer, Scottish Water, Dunfermline, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1756-8404
Print ISSN: 1368-1494
ICE Publishing: All rights reserved
2022
Dams and Reservoirs (2023) 33 (1): 9–18.
Citation
McHugh R, Craig M, Morrin R (2023), "Lessons learned from reservoir discontinuances". Dams and Reservoirs, Vol. 33 No. 1 pp. 9–18, doi: https://doi.org/10.1680/jdare.22.00084
Download citation file:
New and popular articles
Suggested Reading
Effect of fine content on asphalt concrete core-transition layer interface shear behaviour
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (April,2026)
Severn Barrage, UK—environmental reappraisal
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (March,2005)
Ladybower Dam: upgrading in a national park
Proceedings of the Institution of Civil Engineers - Water Management (March,2004)
Briefing: Reservoirs in the landscape: design principles
Dams and Reservoirs (June,2026)
ICOLD Embankment Dams Committee Activities, ICOLD Johannesburg, May 2016
Dams and Reservoirs (August,2017)
Related Chapters
Analysis of progressive failure and cracking in old British dams
Selected papers on geotechnical engineering by P R Vaughan
Hidroaysén Case: Building Dams in Chile’s Patagonia Region
Climate Change and the 2030 Corporate Agenda for Sustainable Development
Slope stability and embankment dams
The Essence of Geotechnical Engineering: 60 years of Géotechnique
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.