Scammonden dam has been described as a unique structure, with its large embankment not only forming part of the M62 motorway, but also impounding a reservoir. This paper presents the recollections and reflections on this huge project from the viewpoint of its two authors, who were present on the site for most of the construction period. One of the authors, who is a highway engineer, was the materials engineer for the main contractor, Sir Alfred McAlpine & Son. The other author, who is a geotechnical engineer, was involved with some of the instrumentation. The important role of the contractor in sourcing materials for the embankment is described. Each author made a significant contribution in a sequence of events which arose towards the end of embankment construction. This began with identifying an issue relating to the extremely high pore-water pressures in the clay core and then in a preliminary assessment of the effect of this on upstream slope stability during the early stages of reservoir impounding.
Article navigation
1 September 2023
Research Article|
April 25 2023
Recollections and reflections on the construction of Scammonden dam (1966–1970)
Dennis Parkinson, MSc, MCIHT, MICT, MIAT;
Dennis Parkinson, MSc, MCIHT, MICT, MIAT
Former Technical Director, Alfred McAlpine Quarries, Crewe, UK(corresponding author: dennis.parkinson10@hotmail.co.uk)
Search for other works by this author on:
J. Andrew Charles, PhD, DSc(Eng), FREng, FICE
J. Andrew Charles, PhD, DSc(Eng), FREng, FICE
Former Technical Director, BRE, Watford, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1756-8404
Print ISSN: 1368-1494
Emerald Publishing Limited: All rights reserved
2023
Dams and Reservoirs (2023) 33 (3): 100–105.
Citation
Parkinson D, Charles JA (2023), "Recollections and reflections on the construction of Scammonden dam (1966–1970)". Dams and Reservoirs, Vol. 33 No. 3 pp. 100–105, doi: https://doi.org/10.1680/jdare.23.00102
Download citation file:
New and popular articles
Suggested Reading
A potential new frost heave mechanism in high-speed railway embankments
Geotechnique (February,2014)
Mechanical and hydrological impacts of tree removal on a clay fill railway embankment
Geotechnique (August,2015)
Slope stability analysis: a kinematical approach
Geotechnique (June,1995)
Full-scale embankment failure test under simulated train loading
Geotechnique (September,2015)
Observed behaviour of old railway embankments formed of ash and dumped clay fill
Geotechnique (July,2020)
Related Chapters
Sourcing from Multinational Suppliers to Overcome Weak Contracting Institutions and Gain Supply Chain Capabilities
Geography, Location, and Strategy
Exploring the Effects of Discretion, Discrimination, and Oversight on the Inclusiveness of Small Business Contracting
Entrepreneurship for Social Change
Updating and Cleaning Out: The “Make or Buy” Decision in Construction Revisited
10th Nordic Conference on Construction Economics and Organization
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.