An options assessment document was provided to Scottish Water in 2013 with recommendations for the future management of 96 non-operational reservoirs. Six main options for future management were assessed at this stage: option 1, make safe and maintain; option 2, discontinuance (with full depth notch); option 3, sale after making safe; option 4, rent; option 5, generate hydroelectric power; and option 6, let lease revert to landowner. The key stage of the options assessment was a comparison between the estimated costs of the outstanding measures in the interests of safety, or equivalent recommended safety works for non-statutory reservoirs and the cost of discontinuing the reservoir. Options were then selected on the basis of a comparison of the two sets of costs. The potential for generating hydroelectric power was also assessed using flow information for each of the locations, where available.
Article navigation
August 2015
Research Article|
August 01 2015
Managing Scottish Water's non-operational reservoirs
Tony Judge, CEng, MICE
Tony Judge, CEng, MICE
Senior Engineer
Atkins Ltd, Glasgow, UK (tony.judge@atkinsglobal.com)
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1756-8404
Print ISSN: 1368-1494
ICE Publishing: All rights reserved
2015
Dams and Reservoirs (2015) 25 (2): 79–84.
Citation
Judge T (2015), "Managing Scottish Water's non-operational reservoirs". Dams and Reservoirs, Vol. 25 No. 2 pp. 79–84, doi: https://doi.org/10.1680/jdare.15.00017
Download citation file:
Suggested Reading
Decommissioning the Chernobyl nuclear power plant: an update
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2016)
Briefing: Off-site construction of a new nuclear laboratory at Dounreay, Scotland
Proceedings of the Institution of Civil Engineers - Energy (May,2013)
Finding the depth of radioactivity in construction materials
Proceedings of the Institution of Civil Engineers - Energy (May,2013)
Foamed concrete facilitates decommissioning of nuclear plant
Proceedings of the Institution of Civil Engineers - Energy (May,2013)
Cost overruns – helping to define what they really mean
Proceedings of the Institution of Civil Engineers - Civil Engineering (October,2017)
Related Chapters
DOUNREAYILW SHAFT: INTEGRITY OF THE STUB TUNNEL PLUG
Role of Concrete in Nuclear Facilities
PERFORMANCE OF CONCRETE STRUCTURES FOR NUCLEAR REPROCESSING PLANT – REVIEW OF CURRENT RESEARCH AND FUTURE REQUIREMENTS
Role of Concrete in Nuclear Facilities
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
