Article navigation

An options assessment document was provided to Scottish Water in 2013 with recommendations for the future management of 96 non-operational reservoirs. Six main options for future management were assessed at this stage: option 1, make safe and maintain; option 2, discontinuance (with full depth notch); option 3, sale after making safe; option 4, rent; option 5, generate hydroelectric power; and option 6, let lease revert to landowner. The key stage of the options assessment was a comparison between the estimated costs of the outstanding measures in the interests of safety, or equivalent recommended safety works for non-statutory reservoirs and the cost of discontinuing the reservoir. Options were then selected on the basis of a comparison of the two sets of costs. The potential for generating hydroelectric power was also assessed using flow information for each of the locations, where available.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal