Designed by Thomas Hawksley, and completed in 1896, Damflask reservoir was constructed to provide compensation flows to the growing industries downstream in Sheffield. The earth embankment dam incorporates two modified bottom outlets used to release water from the reservoir, each comprising sections of tunnel and pipework together with a series of guard and control valves, to form the reservoir scour system. In 2015, a statutory inspection recommended that improvements were made to comply with modern safety standards and enable the reservoir to be drawn down in a reasonable time, if required in an emergency. This paper provides a brief background to the works at Damflask reservoir and summarises the key technical challenges, which were overcome to improve the existing drawdown facilities; from design development through to construction, commissioning and ongoing operation of the final scheme. It provides an insight into the complex two-year project from the author's perspective as project leader and designer, within the design and build team, commissioned to investigate and undertake the upgrade works.
Article navigation
June 2020
Research Article|
September 07 2020
Damflask reservoir: scour system reservoir safety improvements Available to Purchase
Paul Millard, MEng, MCIEWM, C.WEM, CEnv, MICE, CEng
Paul Millard, MEng, MCIEWM, C.WEM, CEnv, MICE, CEng
Flood Risk Engineer, Mott MacDonald Bentley (MMB), Leeds, UK (paul.millard@mottmac.com)
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1756-8404
Print ISSN: 1368-1494
ICE Publishing: All rights reserved
2020
Dams and Reservoirs (2020) 30 (2): 66–73.
Citation
Millard P (2020), "Damflask reservoir: scour system reservoir safety improvements". Dams and Reservoirs, Vol. 30 No. 2 pp. 66–73, doi: https://doi.org/10.1680/jdare.20.00012
Download citation file:
605
Views
Suggested Reading
Queensferry Crossing, UK: towers, piers and abutments – design and construction
Proceedings of the Institution of Civil Engineers - Bridge Engineering (July,2018)
Three-dimensional effects in the construction of a long retaining wall
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (July,2002)
Using three-dimensional laser scanning for monitoring a long-span arch bridge launch
Proceedings of the Institution of Civil Engineers - Bridge Engineering (May,2019)
A1 River Tyne bridge, UK—design and construction
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2005)
Design and construction of a launched steel girder bridge
Proceedings of the Institution of Civil Engineers - Bridge Engineering (May,2014)
Related Chapters
Influence of self-compacting concrete on the lateral pressure on formwork
ICE Themes Self-Compacting Concrete
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
