Rehabilitation and renovation of damaged tunnels and hydro-mechanical equipment of dam and power plant projects in Iran is a major challenge and has to be seriously planned for now. Considering that Karun 1 dam has been in service for more than 50 years, the service and emergency gates of this project showed extensive damage and needed to be replaced. In the absence of a maintenance intake gate in front of this tunnel and the impossibility of emptying the upstream reservoir – whose dependent power plants must work non-stop – the redesign and installation of new gates must be made under a water head of 110 m. Primarily, four solutions are investigated to repair or replace the damaged parts of service and emergency gates and casing to seal the tunnel; of which one is selected as the final procedure. Then the recommended method of installation of the gates under the water head of 110 m is examined.
Article navigation
September 2020
Research Article|
November 09 2020
Study of rehabilitation plan of bottom outlet service and emergency gates of Karun 1 dam
Mohsen Ghaderi, PhD
Mohsen Ghaderi, PhD
Researcher, Semnan University, Semnan, Iran; Senior Hydro Mechanic Specialist, Head of Design Office, Fanavari Novin Niroo Co., Tehran, Iran (mohsenghaderi57@gmail.com, mohsenghaderi@semnan.ac.ir)
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1756-8404
Print ISSN: 1368-1494
ICE Publishing: All rights reserved
2020
Dams and Reservoirs (2020) 30 (3): 91–96.
Citation
Ghaderi M (2020), "Study of rehabilitation plan of bottom outlet service and emergency gates of Karun 1 dam". Dams and Reservoirs, Vol. 30 No. 3 pp. 91–96, doi: https://doi.org/10.1680/jdare.20.00016
Download citation file:
New and popular articles
Suggested Reading
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Eight footbridges in the Rembrandt Park in Amsterdam
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2006)
Dynamic behavior of concrete filled steel tubular columns
International Journal of Structural Integrity (January,2019)
Structural design of high rise volumetric building systems using hot-rolled steel
Proceedings of the Institution of Civil Engineers - Civil Engineering (August,2019)
Garyllis River Footbridge—harmonising engineering and architectural features
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2007)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.