Permanent siphons are increasingly being employed to increase the discharge capacity at existing reservoirs to ensure the available drawdown provision is in line with current guidance. Routine ‘wet’ testing of reservoir drawdown systems, during which flows are discharged from the system, is considered fundamental to reservoir safety to ensure that there is confidence that such systems can be relied upon to operate in emergency situations. This is particularly true for siphon systems which can be more complex to operate than other gravity systems. However, reservoir discharges to the downstream watercourse may be constrained by requirements for pollution and flood risk mitigation to downstream receptors. The paper outlines a range of options considered and employed across multiple sites to manage the discharge of outflows from permanent siphon systems. It discusses constraints encountered – actual and theoretical – and outlines potential lessons learned for future reservoir siphon schemes. The discussion considers methods of siphon priming; the philosophy of ‘wet’ test operations; how outflows can be terminated; and if and by what means outflows are conveyed to the downstream watercourse or are otherwise managed.
Article navigation
Research Article|
July 09 2026
Considerations for managing reservoir outflows from siphon drawdown schemes
John A. Campbell
Mott MacDonald
, Glasgow, UK
Corresponding author John A. Campbell (john.campbell@mottmac.com)
Search for other works by this author on:
Corresponding author John A. Campbell (john.campbell@mottmac.com)
Publisher: Emerald Publishing
Online ISSN: 1756-8404
Print ISSN: 1368-1494
© 2026 Emerald Publishing Limited
2026
Emerald Publishing Limited
Licensed re-use rights only
Dams and Reservoirs 1–8.
Citation
Campbell JA (2026;), "Considerations for managing reservoir outflows from siphon drawdown schemes". Dams and Reservoirs, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1680/jdare.26.00226
Download citation file:
31
Views
Suggested Reading
Operational experience with existing siphons
Dams and Reservoirs (August,2026)
Discontinuance of Lower Neuadd reservoir
Dams and Reservoirs (October,2022)
Dunside reservoirs discontinuance: taking a new approach
Dams and Reservoirs (May,2024)
Research on the Structure and Application of Fuzzy Environmental Impact Assessment Model
Asian Journal on Quality (August,2004)
Early carbonation curing effects on the microstructure of high initial strength Portland cement pastes
Advances in Cement Research (May,2018)
Related Chapters
Inspection, testing and monitoring of trunk road bridges in England
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Case studies on the impact of overloading bridges in China
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Analysis of progressive failure and cracking in old British dams
Selected papers on geotechnical engineering by P R Vaughan
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.