Risk identification is an integral part of overall risk management framework of projects. The risks associated with projects and their response planning differs according to the country and the sector specific environment in which they are being implemented. In this paper, the study is carried out to identify the critical risk factors causing delay in Kuwait’s building and infrastructure projects. The preparation of a preliminary list of risks and risk factors is outlined, questionnaire development and survey details are explained, and analysis of survey responses for the identification of delay risk factors in Kuwait is presented. A case study analysis with respect to time‐overrun/delay of about 28 building and infrastructure projects executed in Kuwait is also presented to validate the survey results. Survey and case study results show that the frequency of time‐overrun in KuwaitRisk identification is an integral part of overall risk management framework of projects. The risks associated with projects and their response planning differs according to the country and the sector specific environment in which they are being implemented. In this paper, the study is carried out to identify the critical risk factors causing delay in Kuwait’s building and infrastructure projects. The preparation of a preliminary list of risks and risk factors is outlined, questionnaire development and survey details are explained, and analysis of survey responses for the identification of delay risk factors in Kuwait is presented. A case study analysis with respect to time‐overrun/delay of about 28 building and infrastructure projects executed in Kuwait is also presented to validate the survey results. Survey and case study results show that the frequency of time‐overrun in Kuwait’s construction projects is very high. The five most critical time‐overrun factors identified in Kuwait’s infrastructure and building projects are: delay in government approvals/permits, delay in preparation and approval in variation orders, client induced additional work beyond the original scope, changed engineering conditions from the contract document and decreased labor productivity due to extreme climatic conditions. All the above risk factors are rated as moderately critical to very critical in Kuwaits construction projects is very high. The five most critical time‐overrun factors identified in Kuwait’s infrastructure and building projects are: delay in government approvals/permits, delay in preparation and approval in variation orders, client induced additional work beyond the original scope, changed engineering conditions from the contract document and decreased labor productivity due to extreme climatic conditions. All the above risk factors are rated as moderately critical to very critical in Kuwait.
Article navigation
1 December 2008
Review Article|
December 01 2008
An Empirical Approach for Identifying Critical Time‐Ovrerun Risk Factors in Kuwait’s Construction Projects Available to Purchase
Hassan Al Zubaidi;
Hassan Al Zubaidi
Kuwait‐Maastricht Business School, Kuwait
Search for other works by this author on:
Srour Al Otaibi
Srour Al Otaibi
Construction Team leader Ministry of Public Work, Kuwait
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 2054-6246
Print ISSN: 2054-6238
© Emerald Group Publishing Limited
2008
Journal of Economic and Administrative Sciences (2008) 24 (2): 35–53.
Citation
Al Zubaidi H, Al Otaibi S (2008), "An Empirical Approach for Identifying Critical Time‐Ovrerun Risk Factors in Kuwait’s Construction Projects". Journal of Economic and Administrative Sciences, Vol. 24 No. 2 pp. 35–53, doi: https://doi.org/10.1108/10264116200800007
Download citation file:
Suggested Reading
Primary factors influencing bid mark‐up size decisions of general contractors in Kuwait
Journal of Financial Management of Property and Construction (April,2013)
Food habits of university nutrition students: pilot study
Nutrition & Food Science (September,2009)
Supply chain integration in project manufacturing environments: the case of the offshore wind energy construction sector
International Journal of Energy Sector Management (January,2025)
Analyzing client-led innovation enablers in Australian construction projects
International Journal of Managing Projects in Business (June,2019)
Factors affecting the selection of effective cost control techniques in the UK construction industry
Journal of Financial Management of Property and Construction (May,2021)
Related Chapters
Recommendations for Minimising Construction Claims: Achieving Sustainable Relationships Among Stakeholders
Sustainability Management Strategies and Impact in Developing Countries
(Re)Making Home(s) on the Move: Sri Lankan Live-in Migrant Domestic Workers in Kuwait
More than Just a ‘Home’: Understanding the Living Spaces of Families
Entrepreneurial Resilience as a Support Mechanism in Entrepreneurial Ecosystems: Insights from Kuwait
Global, Regional, and National Entrepreneurial Ecosystems: Exploring the Interplay Within the MENA Region
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.