This paper aims to investigate the techno-economic feasibility of wind power potential for a tribal region located in Gachsaran in the South-West of Iran.

Design/methodology/approach

Techno-economic feasibility study and analysis of data were conducted by HOMER v2.68 software. Simulations and calculations were performed for 10 kW turbines, 8 Trojan L16P batteries, 12 kW converter and 12 kW generator. To anticipate the pay back period (PBP) or the time required to reach profitability, an engineering economic method named net equivalent uniform annual was applied.

Findings

The power plant construction cost, including the initial cost, installing, replacing and project operating costs for useful life of 20 years was equal to $40970. The net income of the project for each year was $8538 and the calculations were carried out using interest rate of 18%. Results indicated that PBP was 13 years which is lower than 20 years useful life of the turbine. Therefore, it is economically feasible to use this type of turbine for the nominated region.

Originality/value

There has not been conducted a research regarding remote areas in Iran; therefore, this study aims at closing this research gap. Moreover, this method could be used for any remote areas in any other developing country.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal