Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Cost performance
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry
Available to Purchase
Journal of Engineering, Design and Technology (2024) 22 (5): 1570–1590.
Published: 08 November 2022
... of construction projects, many Afghan public projects experience delays and cost overruns. This study aims to evaluate various attributes and factors influencing cost performance in public construction projects in Afghanistan. Design/methodology/approach The literature review and Delphi method identified 30...
Journal Articles
Cost and time performance analysis of progressive design-build projects
Available to Purchase
Journal of Engineering, Design and Technology (2021) 19 (3): 686–697.
Published: 28 September 2020
...Simon Adamtey Purpose The purpose of this paper is to investigate and determine the time and cost performance of progressive design-build (PDB) projects compared with that of design-build (DB) projects. The objective is to provide empirical evidence on the performance of PDB delivery method...
Journal Articles
Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective
Available to Purchase
Journal of Engineering, Design and Technology (2020) 18 (2): 326–342.
Published: 11 September 2019
... are awarded to notedly inept indigenous contractors. Currently, research on the relationship between risks and cost performance of road projects has predominantly focussed on the client’s perspective. Effects of risks on contractors’ cost performance (profit) are inadequately investigated in literature...
Journal Articles
Quantitative appraisal of cost and time performance of construction projects in public and private universities in Osun State, Nigeria
Available to Purchase
Journal of Engineering, Design and Technology (2017) 15 (5): 619–634.
Published: 09 October 2017
... of construction projects in public and private universities in Osun State, Nigeria. In Nigeria, Aibinu and Jagboro (2002) concluded that construction projects had a mean cost overrun of 17.34 per cent. Ade-Ojo and Babalola (2013) examined the time and cost performance of construction projects under Due...
