Keywords: Costs
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Journal of Engineering, Design and Technology (2019) 17 (2): 330–346.
Published: 21 January 2019
... and specifically designed to be implemented in multi-storey modular buildings in seismic regions such as New Zealand. Design/methodology/approach Using a case study approach, two sample modular multi-storey buildings were purposively selected for the study. A cost-comparison analysis was conducted using...
Journal Articles
Journal of Engineering, Design and Technology (2007) 5 (1): 35–48.
Published: 03 April 2007
...A.A. Oladapo Purpose Variation orders are a common occurrence in construction projects and their impacts have been studied by various authors. However, the contribution of project variations to construction cost and time overruns is yet to be established. The purpose of this study is to assess...

or Create an Account

Close subscription notice
Close access options