Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: Design and build
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Critical success factors for implementing design-build: analysing Malaysian public projects
Available to Purchase
Journal of Engineering, Design and Technology (2022) 20 (5): 1041–1056.
Published: 04 March 2021
...Zheng Ping Lee; Rahimi A. Rahman; Shu Ing Doh Purpose The success rate of design-build (D-B) implementation in Malaysia’s private construction projects is low compared to the nation’s public projects. Thus, the purpose of this paper is to investigate the critical success factors (CSFs) for D-B...
Journal Articles
The antecedents of construction project change: an analysis of design and build procurement application
Available to Purchase
Journal of Engineering, Design and Technology (2023) 21 (3): 655–689.
Published: 26 February 2021
... and a post-positivist, inductive approach to analyse the results of change within a Joint Contracts Tribunal (JCT) Design and Build (D&B) construction project case study. Findings The causal nexus of change during the construction phase is assessed and delineated; the key affecting factors...
